Kaifeng City urban and rural integrated water supply project (Zhengkai City east water supply supporting project) (grant project area) evaluation periodAfter receiving the bidder's doubts, the original bid evaluation committee will be organized to review the doubts. After the review of the bid evaluation Committee, the public announcement of the bidding candidates is changed as follows:
1. Description of the bidding project
1.1 Project name: Kaifeng urban and rural integrated water supply project (Zhengkai East City water supply supporting project) (Approved project area)
1.2 Project Number:HNKX-2023-004
1.3 Source of funds: special debt+Financial funds
1.4 Total investment: The total project investment is81262.58万元
1.5Bidding method: open bidding
1.6 Bidding scope: The first part of the bid: project process tracking and settlement audit consulting, including the implementation stage of project cost control and completion settlement audit。Section II: Supervision and service during construction phase and defect liability phase。
1.7 Term of service: The first bid: contract signing to the completion of acceptance。
Section 2: with the design cycle, construction period and defect liability period
1.8Bidding control price: the first bidding section: construction and installation costs0.55%
Section 2: Supervision fee for preliminary design approval100%
Ii. Division of bid sections
2.1 Bidding section division: The project is divided into two bidding sections
The first section: Kaifeng urban and rural integrated water supply project (Zhengkai East City water supply supporting project) (approved project area) process tracking and settlement audit
Section 2: Supervision of urban and rural integrated water supply project of Kaifeng City (water supply supporting project of East of Zhengkai City) (Approved project area)
2.2 Quality requirements: The first bidding section: meet the requirements of national and industry norms and bidding documents
Section 2: Qualified
Three Qualification requirements of the applicant for bidding:
3.1Section 1:
3.1.1Qualification requirements: independent ability to bear civil liability, valid business license:
3.1.2 Project leader requirements: The proposed project leader must have the professional qualification of a cost engineer, and the practice period is not less than 6 (Relevant certificates, labor contracts and2023年1月1sun-to-day3Social security payment certification materials of months, the practice years shall be based on the initial registration time of the certificate of registered cost engineer);
3.1.3 Financial requirements: The financial situation is good, and there is no property being taken over or frozen;Bidder must provide2020、2021、2022The annual financial audit report issued by an accounting firm shall be provided according to the actual establishment period if the company has not been established for a long time。
3.1.4 Performance requirements: Bidders 2020 年 1 月 1 Since the enterprise has at least1Item result5Cost consulting or tracking audit cost consulting for the whole process of a single contract project worth 100 million yuan or more (provide contract or notice of award)。
3.2Section 2:
3.2.1Qualification requirements: Bidders must have independent legal personality,Applicants with one of the following qualification requirements can apply: ① have Grade A qualification of hydraulic engineering construction supervision (issued by the Ministry of Water Resources) and have Grade A municipal public engineering supervision;② It has the Grade A qualification of water conservancy and hydropower supervision (issued by the Ministry of Housing and Urban-Rural Development) and has the Grade A supervision of municipal public works;③ Comprehensive qualification of project supervision。
3.2.2Personnel requirements: the proposed chief supervision engineer must have a registered supervision engineer certificate of water conservancy engineering and a technical title of associate senior engineer or above;Have a valid labor contract and2023年1Pay continuously in the unit since October3A month's proof of social Security(Insufficient in this unit3Months from the date of employment)。The chief supervision engineer of the proposed project shall not be provided simultaneously3Letter of commitment from the chief supervision engineer of more than one project (format to be prepared by oneself)。
3.2.3Financial requirements: The financial situation is good, and there is no property being taken over or frozen;Bidder to provide2020、2021、2022The annual audit report (including balance sheet, cash flow statement and profit statement) of the accounting firm or audit institution shall be provided by the newly established enterprise according to the actual establishment period。
3.2.4The project does not accept the bid of the consortium。
3.3The bidder shall not have a criminal record of bribery in the past three years, and shall provide a letter of commitment, in a self-drafted format, and the promised object: the enterprise and the project leader。
3.4Reputation requirements: The bidder shall not exist in the Treasury[2016]125In the Notice on Issues related to the Inquiry and Use of Credit Records in Government Procurement Activities, the act of refusing to participate in government procurement activities。Bidders should go through the "Credit China" website(www.creditchina.gov.cn)Inquire "trust-breaking persons subject to enforcement" and "Major tax law and trust-breaking subjects", Chinese government procurement website(www.ccgp.gov.cn)Query the "Record List of serious illegal and dishonest behaviors in Government procurement" channel to query your own credit history, and provide the query screenshot (the query date is after the announcement date)。
3.5During the implementation of the project, the person in charge of the proposed project shall not be replaced for any reason。
Iv. Number of bid Evaluation Committee members:5人
5. Bid evaluation
4.1 Candidates recommended by the bid evaluation committee
The first section: Kaifeng urban and rural integrated water supply project (Zhengkai East City water supply supporting project) (approved project area) process tracking and settlement audit
序号 |
Name of candidate |
Tender offer- |
Project leader |
Quality requirement |
Term of service |
1 |
Zhiyuan Engineering Management Co. LTD |
0.2% of the cost of construction and installation works(Construction and installation costs0.52%) |
Xu Ligong |
Meet the requirements of national and industry norms and bidding documents |
The contract shall be signed until the completion and acceptance |
2 |
Zhibo International Engineering Consulting Co., LTD |
Zero per cent of the construction and installation costs(Construction and installation costs0.54%) |
Si Hongwei |
Meet the requirements of national and industry norms and bidding documents |
The contract shall be signed until the completion and acceptance |
3 |
Xincheng International Engineering Consulting Co., LTD |
Zero percent of the cost of construction and installation works(Construction and installation costs0.45%) |
Zhang Weiguo |
Meet the requirements of national and industry norms and bidding documents |
The contract shall be signed until the completion and acceptance |
4 |
Henan Sifang construction management Co., LTD |
Zero per cent of the construction and installation costs(Construction and installation costs0.54%) |
冯亮 |
Meet the requirements of national and industry norms and bidding documents |
The contract shall be signed until the completion and acceptance |
5 |
Chenghui Engineering Management Co., LTD |
0.2% of the cost of construction and installation works (Construction and installation costs0.52%) |
刘薇 |
Meet the requirements of national and industry norms and bidding documents |
The contract shall be signed until the completion and acceptance |
Section 2: Supervision of urban and rural integrated water supply project of Kaifeng City (water supply supporting project of East of Zhengkai City) (Approved project area)。
序号 |
Name of candidate |
Tender offer |
Project leader |
Quality control panel |
Supervisory service term |
1 |
New Hengfeng Consulting Group Co., LTD |
Per cent of the supervision fee for preliminary design approvalNine Chi Wu (Supervision fee for preliminary design approval95.00%) |
Lian Jiajia |
合格 |
With the design cycle, construction period and defect liability period |
2 |
Zhongyun Tianlong Engineering Group Co., LTD |
Per cent of the supervision fee for preliminary design approvalAll the same, all the same(Supervision fee for preliminary design approval99.50%) |
Chen Guangyan |
合格 |
With the design cycle, construction period and defect liability period |
3 |
Henan Haina construction management Co., LTD |
Per cent of the supervision fee for preliminary design approvalNine points one(Supervision fee for preliminary design approval95.10%) |
Wang Xinqiang |
合格 |
With the design cycle, construction period and defect liability period |
4 |
Jingyuan International Engineering Consulting Co., LTD |
Per cent of the supervision fee for preliminary design approvalNine pick up nine points premises (Supervision fee for preliminary design approval99.40%) |
Wu Jinfang |
合格 |
With the design cycle, construction period and defect liability period |
5 |
Shenghua Construction Consulting Co., LTD |
Per cent of the supervision fee for preliminary design approvalThe nine pick up the wood(Supervision fee for preliminary design approval96.50%) |
Chen Wenbin |
合格 |
With the design cycle, construction period and defect liability period |
6 |
Hengzhiyu Engineering Group Co., LTD |
Per cent of the supervision fee for preliminary design approvalNine pick up the five points of land (Supervision fee for preliminary design approval95.60%) |
Condeillon |
合格 |
With the design cycle, construction period and defect liability period |
7 |
Zhongding Jinghong Engineering Management Co., LTD |
Per cent of the supervision fee for preliminary design approvalThe same goes for the same (Supervision fee for preliminary design approval95.90%) |
Zhang Pingyuan |
合格 |
With the design cycle, construction period and defect liability period |
8 |
Henan Everbright Construction management Co., LTD |
Per cent of the supervision fee for preliminary design approvalNine eight (Supervision fee for preliminary design approval98.00%) |
李龙 |
合格 |
With the design cycle, construction period and defect liability period |
9 |
Shousheng International Engineering Consulting Group Co., LTD |
Per cent of the supervision fee for preliminary design approvalNine thirty seven (Supervision fee for preliminary design approval97.00%) |
Li Yongqiang |
合格 |
With the design cycle, construction period and defect liability period |
10 |
China Construction Excellence Construction Management Co., LTD |
Per cent of the supervision fee for preliminary design approvalJiushijiu(Supervision fee for preliminary design approval99.00%) |
Shen Weipeng |
合格 |
With the design cycle, construction period and defect liability period |
4.2 Evaluation of candidate project managers,
The first section: Kaifeng urban and rural integrated water supply project (Zhengkai East City water supply supporting project) (approved project area) process tracking and settlement audit
Bid the full name of the candidate |
Personnel category |
姓名 |
职称 |
Certificate name |
证号 |
Zhiyuan Engineering Management Co. LTD |
一级 |
Xu Ligong |
Senior engineer |
Registered cost engineer |
建[造]11034100005994 |
一级 |
Li Zhiqiang |
Engineer |
Registered cost engineer |
建[造]11194100013236 |
|
一级 |
Pan Ranran |
Engineer |
Registered cost engineer |
建[造]11194100013245 |
|
一级 |
Li Laixuan |
Engineer |
Registered cost engineer |
建[造]11204100000911 |
|
一级 |
Wu Xiaonan |
Engineer |
Registered cost engineer |
建[造]11224100008361 |
|
一级 |
李卓 |
Senior engineer |
Registered cost engineer |
建[造]11184100009941 |
|
一级 |
Zhang Ruiguo |
/ |
Registered cost engineer |
建[造]11214100003086 |
|
一级 |
He Caiyun |
/ |
Registered cost engineer |
建[造]11214100005647 |
|
一级 |
Huang Yanzhao |
/ |
Registered cost engineer |
建[造]11214100004871 |
|
一级 |
粟军 |
Senior engineer |
Registered cost engineer |
建[造]11134100006127 |
|
一级 |
郑兵 |
Senior engineer |
Registered cost engineer |
建[造]11134100006004 |
|
一级 |
孟娟 |
Senior engineer |
Registered cost engineer |
建[造]11164100001158 |
|
一级 |
孙远 |
Senior engineer |
Registered cost engineer |
建[造]11194100013516 |
|
一级 |
Gao Yonggang |
/ |
Registered cost engineer |
建[造]11204100000545 |
|
一级 |
Sun Yanshan |
Senior engineer |
Registered cost engineer |
建[造]14174100003359 |
|
一级 |
Bai Xinhui |
Engineer |
Registered cost engineer |
建[造]14224100008316 |
|
一级 |
Juhong method |
/ |
Registered cost engineer |
建[造]14084100001157 |
|
一级 |
Zhang Guangxin |
/ |
Registered cost engineer |
建[造]14224100008340 |
|
一级 |
Xie Junyan |
/ |
Registered cost engineer |
建[造]14204100001218 |
|
一级 |
Commissural signal |
/ |
Registered cost engineer |
建[造]11214100005626 |
|
一级 |
Ren Guohua |
/ |
Registered cost engineer |
建[造]14184100010452 |
|
一级 |
刘月 |
/ |
Registered cost engineer |
建[造]11214100003112 |
|
Zhibo International Engineering Consulting Co., LTD |
经理 |
Si Hongwei |
Senior engineer |
Class I registered cost engineer |
建【欧洲杯365买球】15410006504 |
经理 |
Xu Yuanzhong |
Senior engineer |
Class I registered cost engineer |
建【欧洲杯365买球】11084100001466 |
|
总工 |
Fu Xiaoyan |
Senior engineer |
Class I registered cost engineer |
建【欧洲杯365买球】07410007440 |
|
Cost personnel |
Yang Xiaolin |
Senior engineer |
Class I registered cost engineer |
建【欧洲杯365买球】11194100013938 |
|
Cost personnel |
Wu Fanghua |
Senior engineer |
Class I registered cost engineer |
建【欧洲杯365买球】15410006428 |
|
Cost personnel |
Wu Jinhua |
Senior engineer |
Class I registered cost engineer |
建【欧洲杯365买球】11224100010994 |
|
Cost personnel |
Song Danping |
Senior engineer |
Class I registered cost engineer |
建【欧洲杯365买球】11194100013672 |
|
Cost personnel |
李莲 |
Senior engineer |
Class I registered cost engineer |
建【欧洲杯365买球】11194100011134 |
|
Cost personnel |
Wang Bingjun |
Senior engineer |
Class I registered cost engineer |
建【欧洲杯365买球】11144100011398 |
|
造价 人员 |
Zhao Yunan |
Senior worker 程师 |
Primary registration Cost engineer |
建【欧洲杯365买球】 11134100006144 |
|
Cost personnel |
吕芳 |
Senior engineer |
Class I registered cost engineer |
建【欧洲杯365买球】11124100001814 |
|
Cost personnel |
刘璐 |
Senior engineer |
Class I registered cost engineer |
建【欧洲杯365买球】14194100013134 |
|
Cost personnel |
Yang Yuehua |
Intermediate engineer |
Class I registered cost engineer |
建【欧洲杯365买球】14204100001295 |
|
Cost personnel |
Wang Jiangang |
Intermediate engineer |
Class I registered cost engineer |
建【欧洲杯365买球】14204100000852 |
|
Cost personnel |
Zhao Lingzhi |
/ |
Class I registered cost engineer |
建【欧洲杯365买球】14204100000846 |
|
Cost personnel |
Li Guanjun |
Intermediate engineer |
Class I registered cost engineer |
建【欧洲杯365买球】13221151021389 |
|
Cost personnel |
汪芳 |
Intermediate engineer |
Class I registered cost engineer |
建【欧洲杯365买球】19410010195 |
|
Cost personnel |
Liu Menghao |
Intermediate engineer |
Class I registered cost engineer |
建【欧洲杯365买球】11214100006919 |
|
Cost personnel |
Li Xiujuan |
Intermediate engineer |
Class I registered cost engineer |
建【欧洲杯365买球】11194100012912 |
|
Cost personnel |
王涵 |
Intermediate engineer |
Class I registered cost engineer |
建【欧洲杯365买球】11204100000809 |
|
Cost personnel |
Wu Mengqian |
Intermediate engineer |
Class I registered cost engineer |
建【欧洲杯365买球】11214100004352 |
|
Cost personnel |
裴丛 |
Intermediate engineer |
Class I registered cost engineer |
建【欧洲杯365买球】11214100004880 |
|
Cost personnel |
Alpine blue |
/ |
Class I registered cost engineer |
建【欧洲杯365买球】11194100013929 |
|
Cost personnel |
Liu Xinning |
/ |
Class I registered cost engineer |
建【欧洲杯365买球】11194100013664 |
|
Cost personnel |
王一 |
/ |
Class I registered cost engineer |
建【欧洲杯365买球】11214100004162 |
|
Xincheng International Engineering Consulting Co., LTD |
Project leader |
Zhang Weiguo |
Senior engineer |
Class I registered cost engineer |
建[造]11084100001185 |
Head of civil engineering |
Fu Qingpo |
Senior engineer |
Class I registered cost engineer |
建[造]11104100011678 |
|
Member of the civil engineering team |
Liu Shanshan |
Senior engineer |
Class I registered cost engineer |
建[造]11410004993 |
|
Member of the civil engineering team |
Cui Jiaojiao |
Senior engineer |
Class I registered cost engineer |
建[造]11184100009972 |
|
Member of the civil engineering team |
Song Xiling |
Senior engineer |
Class I registered cost engineer |
建[造]11164100001187 |
|
Civil engineering section 成员 |
Zhang Guangyu |
Senior engineer |
Class I registered cost engineer |
建[造]11194100012248 |
|
Member of the civil engineering team |
Zhang Junhui |
Senior engineer |
Class I registered cost engineer |
建[造]11134100005797 |
|
Member of the civil engineering team |
Zhang Yingying |
/ |
Class I registered cost engineer |
建[造]11194100013820 |
|
Member of the civil engineering team |
苏杰 |
/ |
Class I registered cost engineer |
建[造]11224100007693 |
|
Member of the civil engineering team |
魏巍 |
/ |
Class I registered cost engineer |
建[造]11214100004892 |
|
Member of the civil engineering team |
Jin Jianjian |
/ |
Class I registered cost engineer |
建[造]11224100007954 |
|
Member of the civil engineering team |
孔然 |
/ |
Class I registered cost engineer |
建[造]11224100008420 |
|
Installation manager |
Chen Jingjing |
Senior engineer |
Class I registered cost engineer |
建[造]14204100000957 |
|
Installation group member |
Cao Yuee |
Senior engineer |
Class I registered cost engineer |
建[造]14184100009968 |
|
Installation group member |
Li Lili |
/ |
Class I registered cost engineer |
建[造]14194100014248 |
|
Installation group member |
吴楠 |
/ |
Class I registered cost engineer |
建[造]14224100010676 |
|
Installation group member |
Zhang Liker |
/ |
Class I registered cost engineer |
建[造]14214100004262 |
|
Proposed to send cost engineer |
张昉 |
/ |
Class I registered cost engineer |
建[造]11184100009971 |
|
Proposed to send cost engineer |
Wang Dandan |
/ |
Class I registered cost engineer |
建[造]11204100000607 |
|
Proposed to send cost engineer |
Zhu Huimin |
/ |
Class I registered cost engineer |
建[造]11224100009224 |
|
Proposed to send cost engineer |
陈静 |
/ |
Class I registered cost engineer |
建[造]11184100009970 |
|
Proposed to send cost engineer |
郭勇 |
/ |
Class I registered cost engineer |
建[造]11214100003492 |
|
拟派 Cost engineer |
Kong Xianxin |
/ |
Class I registered cost engineer |
建[造]11134100005776 |
|
Henan Sifang construction management Co., LTD |
Project leader |
冯亮 |
Senior engineer |
Grade I cost Engineer registration certificate |
建[造]11014100006111 |
Civil engineering professional cost engineer |
Gao Lingyun |
Senior engineer |
Grade I cost Engineer registration certificate |
建[造]11214100004826 |
|
Civil engineering professional cost engineer |
Yin Junyan |
/ |
Grade I cost Engineer registration certificate |
建[造]11214100003617 |
|
Specialized in civil construction Price engineer |
Zhang Suxia |
Senior engineer |
Grade I cost Engineer registration certificate |
建[造]11194100012372 |
|
Specialized in civil construction Price engineer |
Duan Liping |
/ |
First class cost engineering Certificate of registration |
建[造]11214100003660 |
|
Installation specialty Price engineer |
Li Wenmin |
/ |
Grade I cost Engineer registration certificate |
建[造]07410005863 |
|
Installation specialty Price engineer |
Liu Honglei |
/ |
Grade I cost Engineer registration certificate |
建[造]14194100013811 |
|
Cost engineer |
Li Xiaoming |
/ |
Grade I cost Engineer registration certificate |
建[造]11214100004664 |
|
Cost engineer |
江海 |
/ |
Grade I cost Engineer registration certificate |
建[造]11014100006088 |
|
Cost engineer |
Hu Jihai |
/ |
Grade I cost Engineer registration certificate |
建[造]11214100005304 |
|
Cost engineer |
王漻 |
/ |
Grade I cost Engineer registration certificate |
建[造]11014100006075 |
|
Cost engineer |
Liu Yongjing |
/ |
Grade I cost Engineer registration certificate |
建[造]11174100003460 |
|
Chenghui Engineering Management Co., LTD |
Civil construction professional registered cost engineer |
刘薇 |
Senior engineer |
Class I registered cost engineer |
建[造]11094100005737 |
Civil construction professional registered cost engineer |
张豪 |
Senior engineer |
Class I registered cost engineer |
建[造]11064100011612 |
|
Civil engineering professional registration cost |
Yang Huatian |
Senior engineer |
Class I registered cost engineer |
建[造]11184100008272 |
|
Civil engineering professional registration cost |
Yao Peibin |
Senior engineer |
Class I registered cost engineer |
建[造]11164100001857 |
|
Civil engineering professional registration cost |
Zhu Lichao |
Senior engineer |
Class I registered cost engineer |
建[造]03410004842 |
|
Civil engineering professional registration cost |
Hou Xiaoyan |
Intermediate engineer |
Class I registered cost engineer |
建[造]15410006257 |
|
Civil engineering professional registration cost |
Zhang Yanxia |
Intermediate engineer |
Class I registered cost engineer |
建[造]11194100013731 |
|
Civil engineering professional registration cost |
Zhou Yaqi |
Intermediate engineer |
Class I registered cost engineer |
建[造]11214100004609 |
|
Civil engineering professional registration cost |
Wang Changsheng |
Intermediate engineer |
Class I registered cost engineer |
建[造]11194100013515 |
|
Civil construction professional registered cost engineer |
晋鹏 |
/ |
Class I registered cost engineer |
建[造]11184100010566 |
|
Installation professional registered cost engineer |
Wang Weihao |
Senior engineer |
Class I registered cost engineer |
建[造]14224100008505 |
|
Installation professional registered cost engineer |
Li Hongli |
Senior engineer |
Class I registered cost engineer |
建[造]14194100013695 |
|
Installation professional registered cost engineer |
He Qinghui |
Senior engineer |
Class I registered cost engineer |
建[造]14194100013704 |
|
Installation professional registered cost engineer |
Chu Yanru |
Intermediate engineer |
Class I registered cost engineer |
建[造]14224100008545 |
|
Professional technical personnel |
李壮 |
Senior engineer |
Class I registered cost engineer |
建[造]13221151008085 |
|
Professional technical personnel |
张丽 |
Intermediate engineer |
Class I registered cost engineer |
建[造]12234154011200 |
|
Professional technical personnel |
Gu Liuzhen |
Intermediate engineer |
Class I registered cost engineer |
建[造]12234154013371 |
|
Professional technical personnel |
徐倩 |
/ |
Class I registered cost engineer |
建[造]14224100008128 |
|
Professional technical personnel |
Li Guanglei |
Senior engineer |
Class I registered cost engineer |
建[造]11204100000972 |
|
Professional technical personnel |
Zheng Weina |
/ |
Class I registered cost engineer |
建[造]11204100010169 |
Section 2: Supervision of urban and rural integrated water supply project of Kaifeng City (water supply supporting project of East of Zhengkai City) (Approved project area)
Bid the full name of the candidate |
Work in this project |
姓名 |
职称 |
Certificate name |
证号 |
New Hengfeng Consulting Group Co., LTD |
Chief supervision engineer |
Lian Jiajia |
Senior engineer |
National registered supervision engineer certificate |
41010046 |
Chief supervision engineer representative |
陈震 |
Senior engineer |
National registered supervision engineer certificate |
41010860 |
|
Professional supervision engineer |
Wang Jingjuan |
Engineer |
Professional supervision engineer certificate |
18100709 |
|
Professional supervision engineer |
孙攀 |
Engineer |
National registered supervision engineer certificate |
41017915 |
|
Cost engineer |
Li Congmei |
Senior engineer |
National registered Level I cost engineer certificate |
建造]11214100003536 |
|
supervisor |
Ma Wutao |
Engineer |
Professional supervision engineer certificate |
19104832 |
|
witness |
Li Pengfei |
Assistant engineer |
witness |
H41160050100418 |
|
Zhongyun Tianlong Engineering Group Limited company |
Chief supervision engineer |
Chen Guangyan |
Senior engineer |
Certificate of registered Supervision Engineer |
2210003735 |
Director's representative |
Ding Ruipin |
Engineer |
Certificate of registered Supervision Engineer |
2210000049 |
|
Professional supervision engineer |
Zhang Sihai |
Engineer |
Certificate of registered Supervision Engineer |
2210004351 |
|
Professional supervision engineer |
魏征 |
Engineer |
Certificate of registered Supervision Engineer |
2210004350 |
|
Professional supervision engineer |
Shan Hongzhou |
Engineer |
Certificate of registered Supervision Engineer |
41017091 |
|
Professional supervision engineer |
Song Yapeng |
Assistant engineer |
Professional supervision Engineer |
19102008 |
|
Professional supervision engineer |
Guo Mingyang |
Assistant engineer |
Professional supervision engineer |
19101988 |
|
Cost supervision engineer |
Cui Furing |
Senior engineer |
Registered cost engineer/Registered supervision engineer |
建[造]1113410 0006249、41006650 |
|
supervisor |
Zhou Xiaopeng |
无 |
supervisor |
20201268 |
|
witness |
Guo Xiaoyu |
Engineer |
witness |
H41170050000003 |
|
documenter |
Song Jilao |
Engineer |
documenter |
41171140001899 |
|
Safety officer |
Chen Zhimin |
Assistant engineer |
Safety officer |
H41150010004415 |
|
Henan Haina construction management Limited company |
Project director |
Wang Xinqiang |
Senior engineer |
Hydraulic engineering registered supervision engineer certificate |
2310007921 |
Director's representative |
Zhang Xiaoke |
Senior engineer |
Certificate of registered Supervision Engineer |
00375249 |
|
Professional supervision engineer |
郑菲 |
Engineer |
Registered Supervision Engineer Certificate Water Conservancy Registered Engineer certificate |
2210007172建造11224100008417 |
|
Professional supervision engineer |
Majinlong |
Engineer |
Certificate of registered Supervision Engineer |
00516194 |
|
Professional supervision engineer |
Li Mingjun |
Engineer |
Certificate of registered Supervision Engineer |
00436705 |
|
Professional supervision engineer |
耿府 |
Assistant engineer |
Professional supervision engineer certificate |
18102543 |
|
Professional supervision engineer |
孙维 |
Assistant engineer |
Professional supervision engineer certificate |
18106870 |
|
Professional supervision engineer |
Xu Xueli |
Senior engineer |
Hydraulic engineering registered supervision engineer certificate |
2310007881 |
|
Professional supervision engineer |
Li Xiran |
Senior engineer |
Registered Supervision Engineer Certificate Environmental Protection Engineer Certificate |
HJJL20220723059130J41180184541 |
|
Full-time surveyor |
Zhang Qiuju |
Assistant engineer |
Surveyor's certificate |
H41150030100003 |
|
supervisor |
Ren Xiaolin |
Engineer |
Professional supervision engineer certificate |
19104888 |
|
witness |
Gao Xibao |
Engineer |
Witness card |
H4114005 0100076 |
|
documenter |
Zhang Xixi |
Engineer |
Reference card |
041141149 4114000264 |
|
Jingyuan International Engineering Consulting limited |
Project director |
Wu Jinfang |
Senior engineer |
National Registered Supervision Engineer Certificate of hydraulic engineering |
221002233231009076 |
Director's representative |
Wei Baocheng |
Engineer |
National Registered Supervision Engineer Certificate of hydraulic engineering |
221002710541008381 |
|
Professional supervision engineer |
王静 |
Engineer |
National Registered Supervision Engineer Certificate of hydraulic engineering |
221002273641013108 |
|
Professional supervision engineer |
Zhao Fangzheng |
Engineer |
National registered supervision engineer certificate |
41011297 |
|
Professional supervision engineer |
Li Congjian |
Engineer |
National registered supervision engineer certificate |
31008040 |
|
Professional supervision engineer |
Wang Mingli |
Engineer |
National registered supervision engineer certificate |
41006355 |
|
supervisor |
Wen Mengxin |
Junior engineer |
Certificate of Provincial supervisor |
20201230 |
|
witness |
Ratian |
Junior engineer |
Provincial witness certificate |
H41180050000118 |
|
Safety officer |
Li Shaobo |
Engineer |
Provincial safety officer certificate |
H41150010000048 |
|
documenter |
Li Yanguang |
Engineer |
Provincial documenter certificate |
41151140000054 |
|
Shenghua Construction Consulting Limited 司 |
Chief supervision engineer |
Chen Wenbin |
Senior engineer |
People's Republic of China supervision engineer registration certificate |
2210000886 |
Special supervisor of hydraulic engineering |
Zhao Yulei |
engineer |
People's Republic of China supervision engineer registration certificate |
2210031997 |
|
Municipal commissioner |
李斌 |
Engineer |
Registered supervision engineer registered practice certificate |
41008130 |
|
Installation supervisor |
张健 |
engineer |
Registered supervision engineer registered practice certificate |
41019216 |
|
Special commissioner of water supply and drainage |
Hu Xiangzhi |
Senior engineer |
Registered supervision engineer registered practice certificate |
41003571 |
|
Installation supervisor |
冯勇 |
/ |
Henan Province professional supervision engineer certificate |
19102281 |
|
supervisor |
Dong Haichuan |
/ |
Hydraulic engineering construction supervisor training certificate |
JLYP20234 10218 |
|
supervisor |
Xing Yusheng |
engineer |
Registered supervision engineer registered practice certificate |
41014160 |
|
Full-time safety supervisor |
Zhang Jianfeng |
Engineer |
Henan Province safety officer post certificate |
H41160010 700257 |
|
Hengzhiyu Engineering Group Co., LTD |
Chief engineer |
Condeillon |
Senior engineer |
Registered supervision engineer practice certificate |
41009822 |
Chief supervision engineer representative |
Su Peizhi |
Senior engineer |
Registered supervision engineer practice certificate |
41013096 |
|
Professional supervision engineer |
Yang Jianhua |
Senior engineer |
Registered supervision engineer practice certificate |
41008970 |
|
Professional supervision engineer |
王鹏 |
Senior engineer |
Registered supervision engineer practice certificate |
41009129 |
|
Professional supervision engineer |
Chu Yanli |
Senior engineer |
Registered supervision engineer practice certificate |
41008968 |
|
documenter |
Zhang Qingqing |
Assistant engineer |
Document clerk post certificate |
41171140003843 |
|
supervisor |
Wang Yading |
Engineer |
Registered supervision engineer practice certificate |
41017439 |
|
Safety officer |
张博 |
Engineer |
Safety officer post certificate |
Y041230090 0900102 |
|
witness |
薛彭 |
Senior engineer |
Witness certificate |
H410100501 00029 |
|
Registered cost engineer |
Wang Yanyang |
Senior engineer |
Certified cost Engineer practice certificate |
建[造]111041 00011591 |
|
Zhongding Jinghong Engineering Management Co., LTD |
Project director |
Zhang Pingyuan |
高工 |
Registered supervision engineer |
41008448 |
Director's representative |
Zhang Jingzhuo |
高工 |
Registered supervision engineer |
41009996 |
|
Professional supervision engineer |
Dai Qingbin |
高工 |
Registered supervision engineer |
41008459 |
|
Professional supervision engineer |
李瑶 |
高工 |
Registered supervision engineer |
11010538 |
|
supervisor |
崔松 |
/ |
Supervisor certificate |
19201647 |
|
witness |
Zhu Yuanyuan |
/ |
Witness card |
H41190050100514 |
|
Safety officer |
Yu Yuanbin |
/ |
Safety officer certificate |
H41150010700130 |
|
Henan Everbright Construction management Co., LTD |
Project director |
李龙 |
高工 |
People's Republic of China supervision engineer registration certificate |
2210015664 |
Director's representative |
Zhang Jingyang |
Engineer |
People's Republic of China supervision engineer registration certificate |
2210015665 |
|
Professional supervision engineer |
Sun Yanpeng |
高工 |
People's Republic of China supervision engineer registration certificate |
2210015684 |
|
Professional supervision engineer |
Zhang Yanjun |
Engineer |
People's Republic of China supervision engineer registration certificate |
2210015669 |
|
supervisor |
王强 |
Engineer |
Professional supervision engineer certificate |
21100227 |
|
documenter |
Yang Xiaoai |
Engineer |
Professional supervision engineer certificate, documenter certificate |
19103843、2001050002550 |
|
witness |
Wang Xueqin |
Engineer |
Professional supervision engineer certificate, witness certificate |
19104393、H41160050100091 |
|
Shousheng International Engineering Consulting Group Co., LTD |
Chief supervision engineer |
Li Yongqiang |
Senior engineer |
Certificate of registered Supervision Engineer 书 |
2210026595JLG2009310277 |
Professional supervision engineer |
Yin Xiaohua |
Senior engineer |
Registered supervision engineer certificate |
2210024905 |
|
Professional supervision engineer |
Cheng Xinhui |
Intermediate engineer |
Certificate of registered Supervision Engineer 书 |
2210010362 |
|
Professional supervision engineer |
Wei Zhiming |
Senior engineer |
Registered supervision engineer certificate |
2210011617 |
|
Professional supervision engineer |
蒲聪 |
Intermediate engineer |
Certificate of registered Supervision Engineer |
2210011375 |
|
Professional supervision engineer |
Hao Qingshi |
Intermediate engineer |
Registered supervision engineer certificate |
2210026637JLG201315011 |
|
supervisor |
曾彬 |
Intermediate engineer |
Supervisor post certificate |
JLYP20 235100 |
|
China Construction Excellence construction management has Limited company
|
Chief supervision engineer |
Shen Weipeng |
Senior engineer |
Certificate of registered Supervision Engineer |
2210007466 |
Professional supervision engineer |
Yang Jinfeng |
Engineer |
Certificate of registered Supervision Engineer |
41018557 |
|
Professional supervision engineer |
Jiang Pengzheng |
Engineer |
Certificate of registered Supervision Engineer |
41014582 |
|
Professional supervision engineer |
Li Guangliang |
/ |
Certificate of registered Supervision Engineer |
41019874 |
|
Professional supervision engineer |
Yu Zhanjiang |
/ |
Certificate of registered Supervision Engineer |
41017126 |
|
supervisor |
Zhao Shuangshuang |
助工 |
Professional supervision engineer certificate |
21108406 |
|
witness |
Liu Qingqing |
Engineer |
Witness certificate, professional supervision engineer certificate |
H41180050100245、18102376 |
|
Safety officer |
Huang Fu Chao |
Engineer |
Safety officer certificate, professional supervision engineer certificate |
H41170010106547、18108993 |
4.3 Evaluate the candidate's business performance
Section 1:Kaifeng City urban and rural integrated water supply project (Zhengkai City east water supply supporting project) (approved project area) process tracking and settlement audit
Bid the full name of the candidate |
Project name |
Full name of the construction unit |
Contract signing time |
Contract amount(元) |
Name of project manager |
Zhiyuan Engineering Management Co. LTD |
开封-Zhoukou natural gas pipeline project |
Henan Investment Group Co. LTD |
2022.4.11 |
572563.65 |
Zhang Junwei |
周口-Zhecheng natural gas pipeline project |
Henan Investment Group Co. LTD |
2022.4.11 |
415123.32 |
Zhang Junwei |
|
Zhangye City is in danger of ruin(固废)Disposal and resource utilization center project |
Zhangye Zhengqing environmental protection Department Technology limited company |
2023.3.16 |
479407 |
Zhang Junwei |
|
G106 Follow-up audit of reconstruction and expansion project from Lanqi Junction to Qixian Beiguan section |
Qixian Yuzi urban and rural development and construction Co., LTD |
220.8.3 |
暂计1005000 |
Xu Ligong |
|
Chengfa environmental Research and development center project and the whole process tracking audit services |
Henan Investment Group Co. LTD |
2023.7.21 |
255000 |
Zhang Junwei |
|
Zhibo International Engineering Consulting Co., LTD |
Zhengzhou electronic information engineering new campus project |
Zhengzhou sewage purification Co., LTD |
2022.09.23 |
1403184.00元 |
Si Hongwei |
Urban construction Fengxiang Garden design procurement construction integration (EPC)工程 |
To an Yongyang city construction investment Co., LTD |
2021.10.08 |
639600.00 元 |
Si Hongwei |
|
Luosi County Qinling east section of Luohe river basin integrated protection and restoration of the whole process audit |
Luthi County natural resources 源局 |
2023.01.01 |
/ |
Si Hongwei |
|
Yellow River National Museum project |
Henan Zhengcai travel Investment Co., LTD |
2021.12.27 |
2668644.00元 |
Si Hongwei |
|
Zhuxian Town Green Life Rural Revitalization Demonstration Project (Phase I) |
Henan Yuzi green life industry development Co., LTD |
2022.07.28 |
2095900.00 元 |
Si Hongwei |
|
Xincheng International Engineering Consulting Co., LTD |
Zhoukou big data housing project |
Zhoukou Investment Group Co., LTD |
2020.10.8 |
630000000 |
Fu Qingpo |
Nanyang city 12th complete school construction project engineering cost consulting services |
Nanyang City 12th complete school |
2020.6.26 |
507169000 |
Liu Shanshan |
|
General contract of shantytown Renovation Project in the core area of Wolong Station (East District), Nanyang City, Zheng-Wan High-Speed RailwayEPC)1 标段 |
Nanyang Wanfa Investment limited 公司 |
2020.10.22 |
864660000 |
Zhang Weiguo |
|
Zhengzhou South Railway Station-Station building in front of the north-south ring viaduct and other railway company construction part tracking audit |
Zhengzhou Airport Economic Comprehensive Experimental Zone Financial Audit Bureau (Financial Work Office) |
2021.7.5 |
106700000 |
Fu Qingpo |
|
Jiangsu binhai 9#、10#Tank entry 目 |
Jiangsu Yu Storage Natural Gas Co., LTD |
2021.9.30 |
1627430000 |
Fu Qingpo |
|
Henan Sifang construction management Co., LTD |
Wuyang county water infrastructure comprehensive constructionPP P项目
|
Wuyang capital water Co., LTD/ |
2021.7.30 |
1883168 |
冯亮
|
Zhengjia City Central Kitchen Smart Port (Qingfeng) project
|
Zhengjia City Central kitchen Smart Port Industrial Holding (Qingfeng County) Co., LTD
|
2023.1.30 |
Fixed composite rate 1.2% |
冯亮 |
|
Chenghui Engineering Management Co., LTD |
South South Road, Xihua County Ring road renovation and Jaru River bridge construction project Whole process audit |
Xihua County town construction Set up an investment limited company 司 |
2020.12.03 |
590000000 |
毛永胜 |
Zhoukou port area logistics production Industry cluster area future home The third phase of the garden shantytown reform Construction project cost consulting Service item |
Zhoukou port City investment Development company limited |
2021.03.10 |
685300000 |
毛永胜 |
|
BAA(China) Aviation training center construction project cost consulting |
Henan air Investment Real Estate Co., LTD |
2020.04.16 |
500000000 |
毛永胜 |
|
Nanyang city urban and rural integration demonstration zone Lihedian shantytown renovation project |
Nanyang 淯 New Baihe Construction and Development Co., LTD |
2022.08.18 |
810000000 |
刘薇 |
Section 2: Supervision of urban and rural integrated water supply project of Kaifeng City (water supply supporting project of East of Zhengkai City) (Approved project area)
Bid the full name of the candidate |
Project name |
Full name of the construction unit |
Contract signing time |
Contract amount(元) |
Chief supervision engineer |
New Hengfeng Consulting Group Co., LTD |
Guoyang County surface water plant project supervision |
Guoyang County key project construction management service center |
2021.1.20 |
436.8万元 |
马斌 |
Zhengzhou Shifo water plant renovation project supervision |
Zhengzhou water Investment holding Co., LTD |
2022.12.30 |
1.1% |
Lian Jiajia |
|
Cangnan County county third water plant expansion and upgrading project construction supervision |
Cangnan County water Co., LTD |
2022年 |
95.348万元 |
Jeong Geum-ji |
|
Zhongyun Tianlong Engineering Group Co., LTD |
Jiaozuo City Fucheng Water Plant project (Phase I) Xincheng pressure station and Muye pressure station project supervision |
Jiaozuo City water limited liability company |
2019.12.31 |
305000 元 |
Li Xiaoming |
Construction and maintenance supervision of Zhumadian First sewage treatment plant expansion project |
Zhumadian city sewage treatment co., LTD |
2022.8.19 |
561900 元 |
曹尚 |
|
Shangqiu City No. 4 Water plant renovation and expansion project (Phase III) No 2 标段 |
Shangqiu City Administration Bureau |
2021.3.9 |
The final price for the completion of the construction section0.792% |
许艳 |
|
Lankao County Township sewage treatment (EPC+OMProject demonstration project phase II |
Lankao County housing and urban-rural development Bureau |
2021.6.11 |
586300元 |
Li Wanyou |
|
Anyang city Beiguan District Baizhuang town sewage treatment plant construction project phase I project supervision |
Anyang city Beiguan district Baizhuang town people's government |
2020.8.11 |
398700元 |
Jin Xinhua |
|
Xin 'an County urban sewage treatment facility expansion (Phase I North New District) supervision project |
Xin 'an County developed construction Investment Group Co., LTD |
2020.4.28 |
Construction settlement price0.99% |
曹尚 |
|
Henan Haina construction management Co., LTD |
Luohe city to lead the Lioying project(Wuyang County south and north 2022 Annual groundwater overextraction comprehensive treatment project)Supervision of the second bid section |
Wuyang County city Investment Holding Group Co., LTD |
2021.12.31 |
Construction final settlement price0.7% |
Tang Junhui |
Huaihe urban water supply project supervision project of Huaihe water supply irrigation project in Dabie Mountain Revolutionary Old Area of Henan Province |
Xinyang Dehui water supply Co., LTD |
2021.5.25 |
6196000元 |
Zhao Jiyun |
|
Kaifeng North water purification plant and supporting pipe network construction project PPP 项目 |
Kaifeng City Administration Bureau (Kaifeng City Comprehensive Law Enforcement Bureau) |
2020.5.29 |
1168000元 |
秦勇 |
|
Neihuang County fourth water plant construction project supporting water supply network construction supervision |
Neihuang County water company |
2020.6.24 |
193100元 |
Lv Sujun |
|
Supervision of water plant and pipe network expansion project in Wanggao Industrial Zone, Hezhou City |
Hezhou Zhengyuan Wanggao water Co., LTD |
2022.9.20 |
24130.73万元 |
黄杰 |
|
Wuzhou Regeneration Park infrastructure (expansion park phase II) construction project-Hengsan Road and its ancillary engineering supervision clothing 务 |
Wuzhou Dongrun Industrial development Co., LTD |
2021.10.21 |
Rate quote:0.845% |
刘强 |
|
Jingyuan International Engineering Consulting Co., LTD |
Lingbao City old city water supply network upgrading project |
Lingbao City Jincheng water limited liability company |
2022.8.26 |
Construction control price 1.2%,约 192047.40 元 |
Zhao Fangzheng |
Neihuang County ceramic park water supply network construction(一~Section four)And supervisor-Supervision section |
Neihuang County water company |
2022.3.22 |
344300.00 元 |
Zhang Dahua |
|
2020至 2021Lianzhou City water supply network upgrading project(二期)Supervise service procurement projects |
Lianzhou City public assets affairs center |
2021.9.23 |
566200.00 元 |
/ |
|
Shenghua Construction Consulting Co., LTD |
Mengzhou City 2022 Supervision of annual groundwater overdraft comprehensive treatment projects |
Mengzhou water conservancy project construction Administration |
2022.8.11 |
333000元 |
Zoudary |
Shangqiu No. 4 Water Plant Renovation and Expansion Project (Phase II) |
Shangqiu Municipal Construction Investment Co., LTD |
2021.2.7 |
Construction section completion settlement0.795% |
Dong Haomin |
|
Shanting Economic Development Zone infrastructure supporting construction (six networks and one factory) phase I EPC 项目 |
Shandong Shantong pipe network Co., LTD |
2020.10.8 |
investment 1.03% |
Dong Haomin |
|
Hengzhiyu Engineering Group Co., LTD |
Southwest Dajiazhuang village sewage network renovation project |
Yangquan City suburb southwest Haul township Dajiazhuang village villagers committee |
2020.5.8 |
158500.00 元 |
张超 |
Daijiazhuang village water supply network renovation project |
Yangquan City suburb southwest Haul township Dajiazhuang village villagers committee |
2020.5.8 |
67600.00 元 |
张超 |
|
Luoshan County Jianghuai Ecological City education industrial Park (North China University of Water Resources and Hydropower Jianghuai Campus) water supply network and supporting facilities project |
Luoshan County transportation development Co., LTD |
2021.6.23 |
720607.56 元 |
Hou Kunlei |
|
Xinzheng City Laoguanzhai reservoir regional ecological restoration project |
Xinzheng City water resources Bureau |
2020.11 .4 |
1149094.95 元 |
Liu Yabin |
|
Xinyang City Shihe District Nanwan Lake water source comprehensive water environment management project supervision section |
Xinyang city Shihe development investment Co., LTD |
2020.12 .28 |
1449800.00 元 |
薛彭 |
|
2020 Xinxian Shoushui River arrow factory river township and Chendian township section control project |
Xinxian Water Resources Bureau |
2020.4.6 |
189800.00 元 |
Liu Yabin |
|
Zhongding Jinghong Engineering Management Co., LTD |
Supervision of renovation and expansion of Linzhou Third Water Plant and water distribution pipe network project (factory renovation and expansion project) |
Linzhou water supply company |
2020.4.20 |
457480 元 |
许兵 |
Linzhou Economic Development Zone sewage treatment expansion project |
Linzhou City housing and urban-rural construction Bureau |
2020.9.1 |
871200.00 元 |
Wu Zhenyu |
|
Henan Everbright Construction management Co., LTD |
Kaifeng New District No. 2 water plant water supply project water transmission line and raw water pumping station project |
Kaifeng Pufa Water Co., LTD |
2021.6.25 |
607750元 |
Sun Yanpeng |
Henan Province South-to-North water transfer receiving area Zhoukou water supply supporting project Xiangcheng water supply pipeline projectPPPProject supervision section 1 |
Xiang City water Resources Bureau |
2020.4.15 |
1.485% |
Lu Minghua |
|
Mianxian Lianfeng water supply project |
Shaanxi Water Group Mianxian Water supply Co., LTD |
2021.9 |
1080000.00 元 |
Li Shenghui |
|
Shousheng International Engineering Consulting Group Co., LTD |
Daying County rural revitalization water supply security and irrigation area project Taiji water plant raw water supply expansion project |
Daying county Xiangfengzhai reservoir construction and development limited liability company |
2023 年 2 月 |
49.2575 万元 |
Yin Xiaohua |
Yajiang County Xiala town water supply construction project |
Yajiang County water company |
2021 年 11 月 |
102.699 万元 |
陈贵 |
|
China Construction Excellence Construction Management Co., LTD |
Airport economic zone infrastructure supporting construction project II |
Haikou Road and bridge construction investment Co., LTD |
2020.1.20 |
13262950.61 元 |
刘伟 |
2020 Supervision of Linquan County urban road and road network construction project (Transportation hub and urban road construction project of Linquan Station, Anhui section of Zhengfu Railway, Linquan County urban water supply and supporting infrastructure construction project) |
Linquan County housing and urban-rural development Bureau |
2021.1.15 |
3470625.09 元 |
Xu Shumin |
|
Supervision of urban and rural water supply source replacement project in Kaiping District |
Tangshan Kaiping district Agriculture and rural Bureau |
2022.6.30 |
1410000 元 |
Xiong Nianbo |
4.4 Determine the qualifications of candidates to respond to the requirements of the bidding documents
4.4.1 Qualifications required by the bidding documents
序号 |
Qualifications and abilities |
1 |
3.1Section 1:
3.1.1Qualification requirements: independent ability to bear civil liability, valid business license:
3.1.2 Project leader requirements: The proposed project leader must have the professional qualification of a cost engineer, and the practice period is not less than 6 (Relevant certificates, labor contracts and2023年1月1sun-to-day3Social security payment certification materials of months, the practice years shall be based on the initial registration time of the certificate of registered cost engineer);
3.1.3 Financial requirements: The financial situation is good, and there is no property being taken over or frozen;Bidder must provide2020、2021、2022The annual financial audit report issued by an accounting firm shall be provided according to the actual establishment period if the company has not been established for a long time。
3.1.4 Performance requirements: Bidders 2020 年 1 月 1 Since the enterprise has at least1Item result5Cost consulting or tracking audit cost consulting for the whole process of a single contract project worth 100 million yuan or more (provide contract or notice of award)。
3.2Section 2:
3.2.1Qualification requirements: Bidders must have independent legal personality,Applicants with one of the following qualification requirements can apply: ① have Grade A qualification of hydraulic engineering construction supervision (issued by the Ministry of Water Resources) and have Grade A municipal public engineering supervision;② It has the Grade A qualification of water conservancy and hydropower supervision (issued by the Ministry of Housing and Urban-Rural Development) and has the Grade A supervision of municipal public works;③ Comprehensive qualification of project supervision。
3.2.2Personnel requirements: the proposed chief supervision engineer must have a registered supervision engineer certificate of water conservancy engineering and a technical title of associate senior engineer or above;Have a valid labor contract and2023年1Pay continuously in the unit since October3A month's proof of social Security(Insufficient in this unit3Months from the date of employment)。The chief supervision engineer of the proposed project shall not be provided simultaneously3Letter of commitment from the chief supervision engineer of more than one project (format to be prepared by oneself)。
3.2.3Financial requirements: The financial situation is good, and there is no property being taken over or frozen;Bidder to provide2020、2021、2022The annual audit report (including balance sheet, cash flow statement and profit statement) of the accounting firm or audit institution shall be provided by the newly established enterprise according to the actual establishment period。
3.2.4The project does not accept the bid of the consortium。
3.3The bidder shall not have a criminal record of bribery in the past three years, and shall provide a letter of commitment, in a self-drafted format, and the promised object: the enterprise and the project leader。
3.4Reputation requirements: The bidder shall not exist in the Treasury[2016]125In the Notice on Issues related to the Inquiry and Use of Credit Records in Government Procurement Activities, the act of refusing to participate in government procurement activities。Bidders should go through the "Credit China" website(www.creditchina.gov.cn)Inquire "trust-breaking persons subject to enforcement" and "Major tax law and trust-breaking subjects", Chinese government procurement website(www.ccgp.gov.cn)Query the "Record List of serious illegal and dishonest behaviors in Government procurement" channel to query your own credit history, and provide the query screenshot (the query date is after the announcement date)。
3.5During the implementation of the project, the person in charge of the proposed project shall not be replaced for any reason。
|
4.4.2 Determine the qualifications and abilities of the candidates to respond to the requirements of the bidding documents
Pass the list:
The first section: Kaifeng urban and rural integrated water supply project (Zhengkai East City water supply supporting project) (approved project area) process tracking and settlement audit 。
序号 |
Bidder name |
Survey and design fees-Construction cost |
1 |
Zhiyuan Engineering Management Co. LTD |
0.2% of the cost of construction and installation works(Construction and installation costs0.52%) |
2 |
Zhibo International Engineering Consulting Co., LTD |
Zero per cent of the construction and installation costs(Construction and installation costs0.54%) |
3 |
Xincheng International Engineering Consulting Co., LTD |
Zero percent of the cost of construction and installation works(Construction and installation costs0.45%) |
4 |
Henan Sifang construction management Co., LTD |
Zero per cent of the construction and installation costs(Construction and installation costs0.54%) |
5 |
Chenghui Engineering Management Co., LTD |
0.2% of the cost of construction and installation works (Construction and installation costs0.52%) |
Section 2: Supervision of urban and rural integrated water supply project of Kaifeng City (water supply supporting project of East of Zhengkai City) (Approved project area)。
序号 |
Bidder name |
Construction and installation fee quote/Survey and design quotation |
1 |
New Hengfeng Consulting Group Co., LTD |
Per cent of the supervision fee for preliminary design approvalNine Chi Wu (Supervision fee for preliminary design approval95.00%) |
2 |
Zhongyun Tianlong Engineering Group Co., LTD |
Per cent of the supervision fee for preliminary design approvalAll the same, all the same(Supervision fee for preliminary design approval99.50%) |
3 |
Henan Haina construction management Co., LTD |
Per cent of the supervision fee for preliminary design approvalNine points one(Supervision fee for preliminary design approval95.10%) |
4 |
Jingyuan International Engineering Consulting Co., LTD |
Per cent of the supervision fee for preliminary design approvalNine pick up nine points premises (Supervision fee for preliminary design approval99.40%) |
5 |
Shenghua Construction Consulting Co., LTD |
Per cent of the supervision fee for preliminary design approvalThe nine pick up the wood(Supervision fee for preliminary design approval96.50%) |
6 |
Hengzhiyu Engineering Group Co., LTD |
Per cent of the supervision fee for preliminary design approvalNine pick up the five points of land (Supervision fee for preliminary design approval95.60%) |
7 |
Zhongding Jinghong Engineering Management Co., LTD |
Per cent of the supervision fee for preliminary design approvalThe same goes for the same (Supervision fee for preliminary design approval95.90%) |
8 |
Henan Everbright Construction management Co., LTD |
Per cent of the supervision fee for preliminary design approvalNine eight (Supervision fee for preliminary design approval98.00%) |
9 |
Shousheng International Engineering Consulting Group Co., LTD |
Per cent of the supervision fee for preliminary design approvalNine thirty seven (Supervision fee for preliminary design approval97.00%) |
10 |
China Construction Excellence Construction Management Co., LTD |
Per cent of the supervision fee for preliminary design approvalJiushijiu(Supervision fee for preliminary design approval99.00%) |
The method of recommending candidates for selection according to the bidding documents:
Methods of recommending candidates for evaluation:
1Calculate the benchmark price of bid evaluationC:
C=All evaluation conclusions shall be the average of the bid prices of qualified bidders (calculation results are reserved2Decimal place)
Identify the candidate for selection:
The number of qualified bidders for all evaluation conclusions isFThe bid evaluation committee shall sort the bids of the qualified bidders in order from low to high. If the bids are equal, the bids shall be sorted in order from small to large according to the serial number of the bidders on the bid opening record sheet。
②当3≤F≤10All the bidders who are qualified by the evaluation conclusion are recommended as the bidding candidates。
Note: ① When the number of bidders higher or lower than the benchmark bid evaluation price is less than the number of candidates should be determined, the bid candidates should be recommended according to the actual number。
② If the bidder's offer appears in parallel, it will be shortlisted for the bidding candidate at the same time。The number of candidates selected is not limited to the number specified in the above principles。
Note: Only the construction and installation cost quotation is involved in the calculation of the benchmark price, arithmetic average and quotation score value of the bid evaluation, other quotations are not involved。Recommended results are as follows:
The first section: Kaifeng urban and rural integrated water supply project (Zhengkai East City water supply supporting project) (approved project area) process tracking and settlement audit 。
序号 |
Bid the full name of the candidate |
Response condition |
1 |
Zhiyuan Engineering Management Co. LTD |
响应 |
2 |
Zhibo International Engineering Consulting Co., LTD |
响应 |
3 |
Xincheng International Engineering Consulting Co., LTD |
响应 |
4 |
Henan Sifang construction management Co., LTD |
响应 |
5 |
Chenghui Engineering Management Co., LTD |
响应 |
Section 2: Supervision of urban and rural integrated water supply project of Kaifeng City (water supply supporting project of East of Zhengkai City) (Approved project area)。
序号 |
Bid the full name of the candidate |
Response condition |
1 |
New Hengfeng Consulting Group Co., LTD |
响应 |
2 |
Zhongyun Tianlong Engineering Group Co., LTD |
响应 |
3 |
Henan Haina construction management Co., LTD |
响应 |
4 |
Jingyuan International Engineering Consulting Co., LTD |
响应 |
5 |
Shenghua Construction Consulting Co., LTD |
响应 |
6 |
Hengzhiyu Engineering Group Co., LTD |
响应 |
7 |
Zhongding Jinghong Engineering Management Co., LTD |
响应 |
8 |
Henan Everbright Construction management Co., LTD |
响应 |
9 |
Shousheng International Engineering Consulting Group Co., LTD |
响应 |
10 |
China Construction Excellence Construction Management Co., LTD |
响应 |
4.5 Circumstances and reasons for rejecting the bid:
Section 1:Henan Yueteng Engineering Consulting Co., LTD. : the person executed for breach of trust did not inquire legal person,Government procurement serious illegal and dishonest record list inquiry website does not meet the requirements of bidding documents;Yinyuan Engineering Consulting Co., LTD. : What is not provided in accordance with the requirements of the bidding documents is the promise of bribery criminal records in the past three years;Runheng Engineering Management Co., LTD. : failed to submit preferential commitments according to the bid evaluation method;Hongying Project Management Consulting Co., LTD. : failed to provide the commitment letter of bribery criminal records of the enterprise and project leaders in the past three years;China Construction Excellence Construction Management Co., LTD. : Failed to submit preferential commitments according to the bid evaluation method。以上5If the bidder fails to respond to the bidding documents, the bid will be rejected。
4.6 Comprehensive bid score of all bidders: none。
4.7 Technical bid score of all bidders: none。
4.8 Total score of all bidders: None。
5. Other contents of publicity stipulated in the bidding documents:无。
6. Publication media and publicity time
At the same time, this announcement was published on the "China Tendering and Bidding Public Service Platform" and the "Kaifeng Public Resources Trading Information Network"。The publicity period is three working days。
Channels and methods for raising objections
According to the BianPublic Administration Office (2020)13The document stipulates that if the bidder has objections to the above results, it can raise objections to the tenderer on the public resources trading information network cable in Kaifeng City during the publicity period, and the overdue will no longer be accepted, and the tenderer should be from the date of receipt of the objection3Reply within days,If the objector still has objections to the reply or the tenderer fails to make a reply within the prescribed time, the objector may do so on the date of publicity10Within days (objection reply period does not count) in the Kaifeng public resources trading information network online complaint。(In the important document column of the Kaifeng public resources trading information website, there are text formats and requirements for objections and complaints of construction projects)。
8. Contact information
1.Tenderer: Tongxu County Water Development and Construction Co., LTD
Address: Tongxu County Jiefang Road Middle East side
Contact: Mr. Li
Contact number:0371-22273616
2.Bidding agency: Henan Kaixing Engineering Management Consulting Co., LTD
Address: Kaifeng City Tongxu County Yufeng Road west south side youth activity center9楼910室
Contact: Ms. Ren
电话:0371-24992996
3.Supervision unit: Tongxu County Water Resources Bureau
Contact information:0371-24991598
All rights reserved:Kaifeng city public resources trading information networkHost: Kaifeng public resources trading information network
Address: Kaifeng City citizens home 5th floor 邮编:475000 Email: kfggzyjyzx2018@163.com Website record number:Yu ICP prepared No. 12001764-1
Technical support:Zhengzhou Xinyuan Information Technology Co., LTD