Henan pioneer project Management Consulting Co., LTDTongxu County Tonghui urban and rural development Co., LTDCommissioned on the Tongxu County Dasanggou agricultural and sideline products service center construction project for public bidding, in2024年1月3Bid opening and evaluation activities were conducted in Tongxu County Public Resources Trading Center in accordance with the law。The bid evaluation committee conducted the evaluation in accordance with the provisions of the bidding documents, and confirmed by the tenderer, the bid evaluation results are now publicized as follows:
I. Project overview and bidding scope
1.1Project name: Tongxu County Dasanggou agricultural and sideline product service center construction project。
1.2, Project number:HNKC-2023-008
1.3Source of funds:Financial funds+Special bond。
1.4, total investment:Total project investment 24055.00Ten thousand yuan, including the cost of the project18649.45万元。
1.5Project scale and content:Tongxu County Dasanggou agricultural and sideline products service center construction project proposed area of about28000.00 ㎡(约 42.00 Mu), total construction area 41494.00 ㎡;Among them: cold storage building area 13000.00 ㎡, agricultural product processing workshop 9750.00 ㎡, construction area of agricultural products trading center 7920.00 ㎡, e-commerce building construction area 5400.00 ㎡, comprehensive building construction area 5400.00 ㎡, gate building area 24.00 ㎡。(The project is divided into two phases: the first phase of construction and installation costs1900.00Ten thousand yuan, the second phase of construction and installation costs about16749.45万元。)
1.6Construction site:Tongxu county Fengzhuang township big double ditch village S222 路西。
1.7Planned duration:
Section 1:24Months (including the survey period 25 Calendar days, design period 60 Calendar day)。
Section 2: Whole process cost consulting service (project start to final inspection)。
Section 3: with the construction period and defect liability period。
1.8Division of bid sections: The project is divided into three bid sections
The first section: Tongxu County Dasanggou agricultural and sideline products service center construction projectEPCGeneral contract。
The second bid: Tongxu County Dasanggou agricultural and sideline products service center construction project cost of the whole process。
The third section: Tongxu County Dasanggou agricultural and sideline products service center construction project supervision。
1.9, quality requirements:
Section 1: Survey and design: the quality meets the requirements of norms, relevant policies, laws and regulations and the actual needs of the tenderer;Construction: The quality of the project meets the requirements of the design and relevant specifications, and the project is accepted;No safety incident。
The second bidding section: meet the requirements of national and industry norms and bidding documents。
Section 3: Qualified。
1.10Scope of tender:
The first bidding section includes the management, organization and implementation of the whole process of the project investigation, design (including scheme design, preliminary design and construction drawing design within the scope of the red line) and construction, as well as all contents contained in the bidding documents。
The second bidding section: cost consultation of the whole process of the project, including the preparation of the construction drawing budget, the project cost control in the implementation stage and the audit of the completion settlement。
Section 3: Supervision and service during construction phase and defect liability phase。
1.11Bidding control total price:
First lot (EPC):
(1Survey and design fees: Survey fees: 70Ten thousand (seven hundred thousand yuan only), design fee:260Million (two million six hundred thousand yuan only)。
(2Project construction fee: the bidding control price is the project construction fee approved by the audit department98%
Second section (cost) : Lower case:36万元
大写: Three hundred and thirty thousand yuan
Paragraph 3 (Supervision) : Lower case:120万元
大写:One million two hundred thousand yuan
2. Qualification requirements of the applicant for bidding。
3.1Section 1:
3.1.1Qualification requirements: The enterprise has independent legal personality,And should have a valid business license (joint bid,Each party to the consortium shall provide);Must have at the same time ① must have a valid building engineering construction general contracting level and steel structure engineering professional contracting level 2 and above qualifications,And have a valid safety production license issued by the relevant industry authorities;2.Effective construction administrative department issued with engineering design comprehensive Class A qualification,Or have both engineering design and construction industry (construction engineering) Grade A and engineering design commercial food industry Grade A qualification,Or have both engineering design and construction industry (construction engineering) Grade A and engineering design commercial food industry refrigeration engineering professional Grade A qualification;③ with engineering investigation professional class (geotechnical engineering (investigation)) grade B or above or engineering investigation comprehensive class A qualification;(If the consortium bids, ① it shall be provided by the consortium construction party;② Provided by the consortium designer;③ Provided by the consortium surveyor),The overall qualification of the consortium shall meet the qualification requirements of bidders in the bidding documents。
3.1.2Personnel requirements: The project leader has the qualification of a registered construction engineer in the construction engineering profession, and has an effective safety production assessment certificate (BCertificate);And did not act as the project manager of other projects under construction and issued a no-construction commitment;The general contracting project manager and the construction project manager can be the same person (if the contract project undertaken by the general contracting project manager and the construction project manager has been completed or the modification procedures are complete and other circumstances meet the requirements),Corresponding supporting materials shall be provided in the bidding documents,It can be regarded as no construction in progress,Those submitted after the deadline for submission of tender documents will not be accepted);The person in charge of the survey shall have a registered civil engineer (geotechnical);The person in charge of the design must have a Grade I registered architect;The general contracting project manager, construction project manager, survey person in charge, design person in charge, and authorized client must be a regular employee of the unit,Need to provide2023年1月1sun-to-day3Proof of monthly social security payments。
3.1.3Financial requirements: The financial situation is good, and there is no property being taken over or frozen;Bidder must provide must provide business2020年度、2021年度、2022The annual financial audit report (including balance sheet, cash flow statement and income statement) audited by an accounting firm or audit institution. If the enterprise is newly established less than one year ago, it shall provide the financial statements since its establishment。(The consortium leader must provide, other consortium members do not require)。
3.1.4The project accepts the bid of the consortium。
3.1.4.1、The bidder must be an independent legal entity registered in accordance with the law or a consortium composed of different legal entities。
3.1.4.2、In case of joint bidding, the following requirements shall be met:
(1) If a consortium participates, it shall submit the consortium agreement and indicate the work and responsibilities to be undertaken by the leader and the parties, and promise that the parties to the consortium will bear joint and several liabilities to the tenderer once the contract is concluded;
(2) Where a consortium participates in the bidding activities, the parties to the consortium may not participate in the bidding activities under the same contract separately or form a consortium with other members of the consortium;
(3) The leader of the consortium must be the construction party;The legal representative of the lead or its authorized agent shall be responsible for signing the relevant documents of the bidding activity, and the payment of bid security and other fees, signing and sealing of the bid documents shall be signed by the lead;
(4) To participate in the bidding activities in the form of a consortium, the leader must present CA in the Kaifeng public resources electronic trading service platform member system Digital certificate registration, consortium members do not need to register;
(5) The number of consortiums shall not exceed3家。
3.1.5The bidder shall not have a criminal record of bribery in the past three years, and shall provide a letter of commitment, in its own format, and the object of commitment (the first bid section: enterprise, project manager of the general contract, construction project manager, survey person in charge, and design person in charge);
3.1.6Reputation requirements: The bidder shall not exist in the Treasury[2016]125In the Notice on Issues related to the Inquiry and Use of Credit Records in Government Procurement Activities, the act of refusing to participate in government procurement activities。Bidders should go through the "Credit China" website(www.creditchina.gov.cn)Inquire "trust-breaking persons subject to enforcement" and "Major tax law and trust-breaking subjects", Chinese government procurement website(www.ccgp.gov.cn)Query the "record list of serious illegal and dishonest behaviors in government procurement" channel to query your own credit record, and provide the query screenshot (the query date is after the announcement date, provide the relevant query screenshot and stamp the bidder's official seal)。(If it is a consortium bid, both the lead and the members of the consortium need to provide)。
3.1.7During the implementation of the project, the general contracting project manager and construction project manager shall not be replaced for any reason。
3.2Section 2:
3.2.1Qualification requirements: independent ability to bear civil liability, valid business license:
3.2.2Project leader requirements: The project leader to be dispatched must have a first-class cost engineer professional qualification (need to provide relevant certificates, labor contracts and2023年1月1sun-to-day3Proof of social security payment for a month);
3.2.3Financial requirements: The financial situation is good, and there is no property being taken over or frozen;Bidder must provide must provide business2020年度、2021年度、2022The annual financial audit report (including balance sheet, cash flow statement and income statement) audited by an accounting firm or audit institution. If the enterprise is newly established less than one year ago, it shall provide the financial statements since its establishment。
3.2.4Performance requirements:tenderer 2020 年 1 月 1 Since the enterprise has at least1Whole process cost consulting or follow-up audit cost consulting of a similar project (provide contract or notice of award)。
3.2.5Joint bids are not accepted for the second section of the project。
3.2.6The bidder shall not have a criminal record of bribery in the past three years, and shall provide a letter of commitment, in a self-drafted format, and the object of commitment (the second bid paragraph: enterprises and project leaders).。
3.2.7Reputation requirements: The bidder shall not exist in the Treasury[2016]125In the Notice on Issues related to the Inquiry and Use of Credit Records in Government Procurement Activities, the act of refusing to participate in government procurement activities。Bidders should go through the "Credit China" website(www.creditchina.gov.cn)Inquire "trust-breaking persons subject to enforcement" and "Major tax law and trust-breaking subjects", Chinese government procurement website(www.ccgp.gov.cn)Query the "record list of serious illegal and dishonest behaviors in government procurement" channel to query your own credit record, and provide the query screenshot (the query date is after the announcement date, provide the relevant query screenshot and stamp the bidder's official seal)。(If it is a consortium bid, both the lead and the members of the consortium need to provide)。
3.2.8During the implementation of the project, the person in charge of the proposed project shall not be replaced for any reason。
3.3Section 3:
3.3.1The bidder has the status of an independent enterprise legal person,Have a valid three-in-one business license。
3.3.2The bidder shall have Grade B or above qualification of professional supervision of housing construction or comprehensive qualification of project supervision;The chief supervision engineer of the project to be assigned by the bidder shall be qualified as a national registered supervision engineer specializing in housing construction engineering. And in personnel, equipment, capital and other aspects of the corresponding supervision ability。
3.3.3The proposed project director shall have the relevant professional national registered supervision engineer qualification, and other supervisors shall have professional qualification certificates。
3.3.4Social security requirements: The bidder intends to send the project director and the entrusted agent must be the staff of the unit, and pay the pension insurance in the unit (provided2023年1月1Social security certification materials paid for any consecutive three months since the date of employment, the newly hired personnel shall be counted from the date of employment, and the time of issuance shall not be earlier than the time of announcement.。
3.3.5Financial requirements: Enterprise must be provided2020年度、2021年度、2022The annual financial audit report (including balance sheet, cash flow statement and income statement) audited by an accounting firm or audit institution. If the enterprise is newly established less than one year ago, it shall provide the financial statements since its establishment。
3.3.6Reputation requirements: The bidder shall not exist in the Treasury[2016]125In the Notice on Issues related to the Inquiry and Use of Credit Records in Government Procurement Activities, the act of refusing to participate in government procurement activities。Bidders should go through the "Credit China" website(www.creditchina.gov.cn)Inquire "trust-breaking persons subject to enforcement" and "Major tax law and trust-breaking subjects", Chinese government procurement website(www.ccgp.gov.cn)Query the "record list of serious illegal and dishonest behaviors in government procurement" channel to query your own credit record, and provide the query screenshot (the query date is after the announcement date, provide the relevant query screenshot and stamp the bidder's official seal)。(If it is a consortium bid, both the lead and the members of the consortium need to provide)。
3.3.7The consortium bid is not accepted in the third section of the project。
Number of members of the bid evaluation committee:5人
Iv. Bid evaluation
4.1 Candidates recommended by the bid evaluation committee
序号 |
Name of candidate |
Tender offer |
Project general contracting project manager |
Quality standard |
工期 |
1 |
Guizhou Zhongjian Weiye Construction (Group) Co., LTD |
Construction and installation rate of nine hundred and seventy-eight percent(97.85%)Investigation fee697700Yuan, design fee2595200元 |
张波 |
Survey and design: the quality meets the requirements of norms, relevant policies, laws and regulations and the actual needs of the tenderer;Construction: The quality of the project meets the requirements of the design and relevant specifications, and the project is accepted;No safety incident。 |
24Months (including the survey period25Calendar days, design period60Calendar day) |
2 |
Guangzhou fourth construction engineering Co., LTD |
Construction and installation rate of nine hundred and seventy-seven percent(97.70%)Investigation fee700000Yuan, design fee2600000元 |
Chen Shenxin
|
Survey and design: the quality meets the requirements of norms, relevant policies, laws and regulations and the actual needs of the tenderer;Construction: The quality of the project meets the requirements of the design and relevant specifications, and the project is accepted;No safety incident。 |
24Months (including the survey period25Calendar days, design period60Calendar day) |
3 |
Xi 'an Aerospace Construction Group Co., LTD |
Construction and installation rate of nine hundred and seventy-three percent(97.93%)Investigation fee698000Yuan, design fee2596000元 |
Wu Jifeng |
Survey and design: the quality meets the requirements of norms, relevant policies, laws and regulations and the actual needs of the tenderer;Construction: The quality of the project meets the requirements of the design and relevant specifications, and the project is accepted;No safety incident。 |
24Months (including the survey period25Calendar days, design period60Calendar day) |
4 |
Guizhou Construction Engineering Group Third construction engineering Co., LTD |
Construction and installation rate of nine hundred and seventy-eight percent(97.98%)Investigation fee699800Yuan, design fee2597500元 |
Longjiquan County |
Survey and design: the quality meets the requirements of norms, relevant policies, laws and regulations and the actual needs of the tenderer;Construction: The quality of the project meets the requirements of the design and relevant specifications, and the project is accepted;No safety incident。 |
24Months (including the survey period25Calendar days, design period60Calendar day) |
5 |
Fujian Lugang (Group) Co., LTD |
Construction and installation rate of nine hundred and seventy-eight percent(97.81%)Investigation fee700000Yuan, design fee2600000元 |
Huang Shaohuang |
Survey and design: the quality meets the requirements of norms, relevant policies, laws and regulations and the actual needs of the tenderer;Construction: The quality of the project meets the requirements of the design and relevant specifications, and the project is accepted;No safety incident。 |
24Months (including the survey period25Calendar days, design period60Calendar day) |
6 |
Guangdong Dianbai Construction Group Co., LTD |
Construction and installation rate of nine hundred and seventy-eight percent(97.98%)Investigation fee699790Yuan, design fee2599220元 |
Guan Zhiqiang |
Survey and design: the quality meets the requirements of norms, relevant policies, laws and regulations and the actual needs of the tenderer;Construction: The quality of the project meets the requirements of the design and relevant specifications, and the project is accepted;No safety incident。 |
24Months (including the survey period25Calendar days, design period60Calendar day) |
The second bid: Tongxu County Dasanggou agricultural and sideline products service center construction project cost of the whole process
序号 |
Name of candidate |
Tender offer |
Project leader |
Quality requirement |
Term of service |
1 |
Zhongxing Yu Construction Management Co., LTD |
Three hundred and ninety thousand and six hundred yuan(¥309,600.00) |
徐文
|
Meet the requirements of national and industry norms and bidding documents
|
Whole process cost consulting service (project start to final inspection)
|
2 |
Zhong-hongye Engineering Consultants Limited |
Three hundred and eighty thousand eight hundred yuan(¥308,800.00) |
Li Weifeng
|
Meet the requirements of national and industry norms and bidding documents |
Whole process cost consulting service (project start to final inspection) |
3 |
Henan Province Jialong project management Co., LTD |
Two hundred and fifty-two thousand yuan(¥252,000.00) |
Xu Jiaping
|
Meet the requirements of national and industry norms and bidding documents |
Whole process cost consulting service (project start to final inspection) |
4 |
Henan Haina construction management Co., LTD |
Three hundred and ten thousand yuan(¥310,000.00) |
Zhang Haiyan
|
Meet the requirements of national and industry norms and bidding documents |
Whole process cost consulting service (project start to final inspection) |
5 |
Jianda Guoxin Engineering management Co., LTD |
Two hundred and eighty-eight thousand yuan(¥298,000.00) |
Sun Liming
|
Meet the requirements of national and industry norms and bidding documents |
Whole process cost consulting service (project start to final inspection) |
6 |
Zhongyuan Tianwei Group Co. LTD |
Three hundred and fifty thousand eight hundred and ninety-two yuan(¥359,892.00) |
陈莉
|
Meet the requirements of national and industry norms and bidding documents |
Whole process cost consulting service (project start to final inspection) |
The third section: Tongxu County Dasanggou agricultural and sideline products service center construction project supervision
序号 |
Name of candidate |
Tender offer |
Project director |
Quality control objective |
Supervisory service term |
1 |
Sino-singapore Huadu International Engineering Consulting Co., LTD |
One million and thirty-six thousand and six hundred yuan(¥1,036,600.00) |
Li Yanduan |
合格 |
With the construction period and defect liability period |
2 |
Zhongyu Hengxin Engineering Consulting Co., LTD |
One hundred and thirty-eight thousand six hundred yuan(¥1,038,600.00) |
Wang Shaodong |
合格 |
With the construction period and defect liability period |
3 |
Yutong Engineering Management Co., LTD |
One hundred and thirty-nine thousand five hundred yuan(¥1,039,500.00) |
Xu Yongjin |
合格 |
With the construction period and defect liability period |
4 |
Zhengzhou Zhongcheng Construction consulting Co., LTD |
One million and forty thousand yuan(¥1,040,000.00) |
海磊 |
合格 |
With the construction period and defect liability period |
5 |
Henan provincial city investment project management Co., LTD |
One hundred and forty-one thousand yuan(¥1,041,000.00) |
Yuan Jianwei |
合格 |
With the construction period and defect liability period |
6 |
Jingyuan International Engineering Consulting Co., LTD |
One hundred and forty-one thousand and two hundred yuan(¥1,041,200.00) |
Wang Mingli |
合格 |
With the construction period and defect liability period |
7 |
Zhongxing Yu Construction Management Co., LTD |
One hundred and fifty thousand yuan(¥1,056,000.00) |
Wei Xiaodong |
合格 |
With the construction period and defect liability period |
8 |
Zhongding Jinghong Engineering Management Co., LTD |
One hundred and eighty-eight thousand yuan(¥1,068,000.00) |
Zhang Jingzhuo |
合格 |
With the construction period and defect liability period |
9 |
Zhongyun Tianlong Engineering Group Co., LTD |
One hundred and eighty thousand yuan(¥1,080,000.00) |
Lv Zhenyu |
合格 |
With the construction period and defect liability period |
10 |
Henan Everbright Construction management Co., LTD |
One hundred and eighty thousand yuan(¥1,080,000.00) |
Cui Sishu |
合格 |
With the construction period and defect liability period |
11 |
Phalanx Engineering Consulting Co. LTD |
One hundred and eighty thousand yuan(¥1,080,000.00) |
Ding Guixing |
合格 |
With the construction period and defect liability period |
4.2 Evaluation of candidate project managers,
Bid the full name of the candidate |
职务 |
姓名 |
职称 |
Certificate name |
证号 |
Guizhou Zhongjian Weiye Construction (Group) Co., LTD |
General contractor project manager |
张波 |
Engineer |
Registered constructor |
贵1522019202001071 |
Construction project manager |
张波 |
Engineer |
Registered constructor |
贵1522019202001071 |
|
Technical director |
Yu Zhaofu |
Engineer |
Certificate of professional title |
黔中2005711413 |
|
Construction worker |
Deng Lianghui |
Engineer |
Job certificate |
52171010800999 |
|
Quality controller |
Xie Lianghua |
Engineer |
Job certificate |
52161060801245 |
|
Safety officer |
Yang Xianxing |
Engineer |
Safety production assessment certificate |
Qian Jian 'anC(2009)0003220 |
|
Safety officer |
杨焯 |
Assistant engineer |
Safety production assessment certificate |
Qian Jian 'anC(2009)0003958 |
|
documenter |
Zhang Yiteng |
Assistant engineer |
Job certificate |
52171140805427 |
|
materialman |
Liu Xingchen |
Engineer |
Job certificate |
52171110804027 |
|
Cost engineer |
Wu Qiongyu |
Engineer |
Registration certificate |
建[造]11175200002026 |
|
Superintendent of survey |
樊华 |
Senior engineer |
Registration certificate |
AY154100545 |
|
Design leader |
Chen Linlin |
Senior engineer |
Registered architect |
20215000882 |
|
Building manager |
Yang Yuewang |
Engineer |
Registered architect |
20215102405 |
|
Head of structure |
Pang Yanbang |
Engineer |
Registered knot Construction engineer |
S225200609 |
|
Superintendent of water supply and drainage |
Huang Wansong |
Senior engineer |
Registered Utilities Engineer (Water Supply and Drainage) |
CS114200259 |
|
Hvac officer |
袁威 |
Senior engineer |
Registered Utility Engineer (HVAC) |
CN124200172 |
|
Electrical supervisor |
Jiang Rongfang |
Senior engineer |
Registered Electrical Engineer (Power Supply and Distribution) |
DG154200463 |
|
Process supervisor |
肖民 |
Senior engineer |
Certificate of professional title |
2013-GJGCS-080 |
|
Guangzhou fourth construction engineering Co., LTD |
Project general contracting project manager |
Chen Shenxin |
Senior engineer |
Grade I construction Engineer Certificate |
粤1442019202002412 |
Construction project manager |
Chen Shenxin |
Senior engineer |
Grade I construction Engineer Certificate |
粤1442019202002412 |
|
Project technical leader |
Yuan Weiyang |
Senior engineer |
Certificate of professional title |
Guangdong higher vocational certificate character0900101134060 号 |
|
Quality supervisor |
Liang Haojian |
Senior engineer |
Certificate of professional title |
Guangdong higher vocational certificate character1300101075107 号 |
|
Safety manager |
Wu Yajie |
Senior engineer |
Certificate of professional title |
Guangdong higher vocational certificate character1400101097064 号 |
|
Cost manager |
Zhong Zhenting |
Senior engineer |
Certificate of professional title |
Guangdong higher vocational certificate character1801001010738 号 |
|
Full-time safety officer |
Wu Yilong |
Assistant engineer |
Safety production assessment certificate (C 证) Certificate of professional title |
Yue Jian 'anC3(2019)0002403 1901006036425 |
|
Construction worker |
Law Zhiheng |
Engineer |
Construction worker certificate title certificate |
0441610194416017391Guangdong vocational certificate word No1300102198632号 |
|
Quality controller |
Chen Jiawei |
Senior engineer |
Quality officer certificate title certificate |
0441610694416012060Guangdong higher vocational certificate character1801001010711号 |
|
documenter |
Fan Kaibin |
Engineer |
Reference officer certificate title certificate |
04416114944160100982101003057191 |
|
materialman |
Li Weihua |
Engineer |
Material staff certificate title certificate |
0441611194416006521Guangdong vocational certificate word No0800102439199 号 |
|
Design leader |
Zhan Mengyu |
Senior engineer |
Grade I registered architect title certificate |
20194101085B202109070100579 |
|
Head of construction |
卢昕 |
Senior engineer |
Certified architect title certificate |
20221106773 19A20107065 |
|
Structure professional accountability |
Li Jiafu |
Professor level senior engineer |
Registered structural engineer Certificate of professional title |
S10110444918A10107010 |
|
Head of water supply and drainage |
尹瑞 |
Senior engineer |
Registered utility engineer title certificate |
CS201101783 201307067 |
|
Hvac professional responsible person |
Hao Jingzhang |
Professor level senior engineer |
Registered utility engineer title certificate |
CN101100243 2807035 |
|
Electrical professional responsible person |
Yin Liwen |
Senior engineer |
Registered utility engineer title certificate |
DG111101057 201407042 |
|
Process supervisor |
Zhao Dechao |
Senior engineer |
Registered utility engineer title certificate |
CN151101278 201507174 |
|
Superintendent of survey |
Wang Chuansheng |
Senior engineer |
Registered woodworker Engineer (geotechnical) |
B02000900016 AY064100116 |
|
Xi 'an Aerospace Construction Group Co., LTD |
Project general contracting project manager, project manager |
Wu Jifeng |
Senior engineer |
Builder registration certificate |
陕 1412011 201210116 |
Superintendent of survey |
米猛 |
Senior engineer |
Registered civil works division |
AY135100811 |
|
Design leader |
Wang Xiangwei |
researcher |
Class I Registered Architect |
20001101792 |
|
Technical director |
李雄 |
Senior engineer |
Certificate of professional title |
0160785 |
|
Construction worker |
孙帅 |
Assistant engineer |
Job certificate |
0611610196116000348 |
|
Quality controller |
Dong Zhuanming |
Assistant engineer |
Job certificate |
0611610696116003709 |
|
Full-time safety officer |
Zhao Jiaxin |
Assistant engineer |
Safety production assessment certificate |
Shan Jian 'anC3(2019) 0006291 |
|
Full-time safety officer |
Xu Yanxin |
Assistant engineer |
Safety production assessment certificate |
Shan Jian 'anC3(2019) 0029266 |
|
Full-time safety officer |
杨宁 |
Engineer |
Safety production assessment certificate |
Shan Jian 'anC3(2019) 0041050 |
|
materialman |
薛琴 |
Assistant engineer |
Job certificate |
06116111961160 02044 |
|
documenter |
郭立 |
Engineer |
Job certificate |
06116114961160 05799 |
|
Cost engineer |
孙玮 |
Engineer |
Cost engineer |
建[造]1122 6100007592 |
|
Building professionals |
Lippon Key |
Senior engineer |
Class I Registered Architect |
20211106196 |
|
Structural industry professionals |
熊林 |
Senior engineer |
Class I Registered Structural Engineer |
S085101666 |
|
Plumbing professionals |
Zhu Xianliang |
Senior engineer |
Registered Utilities Engineer (Water Supply and Drainage) |
CS113300380 |
|
Hvac professionals |
金京 |
Senior engineer |
Registered Utility Engineer (HVAC) |
CN101100112 |
|
Electrical professional |
Luo Bifan |
Senior engineer |
Registered Electrical Engineer (Power Supply and Distribution) |
DG103100547 |
|
Process professional |
邹威 |
researcher |
Certificate of professional title |
SJYZG2019031 |
|
Guizhou Construction Engineering Group Third construction engineering Co., LTD |
General contracting project manager |
Longjiquan County |
Senior engineer |
Registered constructor |
贵1522014201502788 |
Construction project manager |
Longjiquan County |
Senior engineer |
Registered constructor |
贵1522014201502788 |
|
Technical director |
任民 |
Senior engineer |
Certificate of professional title |
黔高2000053020278 |
|
Construction worker |
Tang Liwei |
Engineer |
Job certificate |
0442210100012000254 |
|
Quality controller |
张坤 |
Engineer |
Job certificate |
0521710695217000036 |
|
Safety officer |
Wang Zhaorui |
/ |
安全c证 |
Qian Jian 'anC3(2018)0078547 |
|
documenter |
Yao Yuanchun |
/ |
Job certificate |
0521811495218000515 |
|
materialman |
陈莹 |
/ |
Job certificate |
05218111952 18000168 |
|
Cost engineer |
Wu Denghui |
/ |
Cost registration certificate |
建[造]11165200000995 |
|
Superintendent of survey |
Yang Qingbo |
Senior engineer |
Registered Civil Engineer (Geotechnical) |
AY113200843 |
|
Head of survey technology |
Gao Zhiya |
Senior engineer |
Registered Civil Engineer (Geotechnical) |
AY144100499 |
|
Design leader |
姜雪 |
Senior engineer |
Class I Registered architect |
20191105564 |
|
Head of construction |
Zhao Tongyu |
Professor level senior engineer |
Grade I registered architect |
2000110178 4 |
|
Structural specialist |
周勇 |
Senior engineer |
Class I Registered Structural Engineer |
S121104816 |
|
Specialist in water supply and drainage |
Zhang Shijun |
Senior engineer |
Certificate of professional title |
C0FC0-GC-A -2020067 |
|
Hvac professional responsible person |
李斌 |
Senior engineer |
Registered Utility Engineer (HVAC) |
CN15110133 0 |
|
Electrical professional responsible person |
张磊 |
Senior engineer |
Certificate of professional title |
C0FC0-GC-A -2021043 |
|
Head of refrigeration technology |
Zhang Yiming |
Senior engineer |
Certificate of professional title |
C0FC0-GC-A -2020066 |
|
Fujian Lugang (Group) Co., LTD |
General contracting project manager, construction project manager |
Huang Shaohuang |
Engineer |
Registered construction Certificate of construction engineer |
闽1352017201822572 |
Design leader |
陈伟 |
Senior engineer |
Grade I registered architect |
20104100648 |
|
Superintendent of survey |
张畅 |
Senior engineer |
Registered woodworker Engineer (geotechnical) |
AY064100054 |
|
Architectural professional responsible person |
Song Haibo |
Senior engineer |
Certificate of professional title |
B20220906190 1721 |
|
Structure professional accountability |
Asia |
Senior engineer |
Certificate of professional title |
B19180900839 |
|
Head of water supply and drainage |
Tan Haoyu |
Senior engineer |
Certificate of professional title |
01583 |
|
Hvac professional responsible person |
Du Jianwei |
Senior engineer |
Certificate of professional title |
01936 |
|
Electrical professional responsible person |
王瑞 |
Senior engineer |
Certificate of professional title |
20190121061 |
|
Process professional responsible person |
Fu Xinwei |
Engineer |
Certificate of professional title |
01791 |
|
技术 Person in charge |
Liu Rongzhen |
Senior engineer |
Certificate of professional title |
闽特G009-03370 |
|
Construction worker |
Lin Jinbin |
/ |
Job certificate |
0352310100024000029 |
|
Quality controller |
Kang Rongbin |
/ |
Job certificate |
0351810693518013187 |
|
专职 Safety officer |
Chen Weiru |
/ |
Secure research certificate |
Min Jian 'an C3(2019) 5260673 |
|
materialman |
Zheng Meiling |
/ |
Job certificate |
0351511193515019078 |
|
documenter |
Xie Wenbin |
/ |
Job certificate |
0352211400022000014 |
|
Cost engineer |
Zeng Huayi |
/ |
Certified cost engineer Certificate |
建[造]11203500001105 |
|
Guangdong Dianbai Construction Group Co., LTD |
General contract Package item load 责人 |
Guan Zhiqiang |
/ |
First class registration 造师 |
粤1442021202201618 |
Construction project 经理 |
Guan Zhiqiang |
/ |
First class registration 造师 |
粤1442021202201618 |
|
Technical responsibility 人 |
Chen Jiangbo |
Advanced engineering 师 |
Certificate of professional title |
2000101090877 |
|
Construction worker |
Zhang Zhenxiao |
Advanced engineering 师 |
Work permit |
0441810194418028204 |
|
Quality controller |
Chen Bincheng |
Advanced engineering 师 |
Work permit |
0441710694417019059 |
|
Full-time security 员 |
Li Jinquan |
Engineer |
Safety production assessment certificate |
Yue Jian 'anC3(2014)0000836 |
|
Full-time security 员 |
Qiu Xiubin |
/ |
Safety production assessment certificate |
Yue Jian 'anC3 (2021)0113600 |
|
Full-time security 员 |
Luo Yongqin |
/ |
Safety production assessment certificate |
Yue Jian 'anC3 (2021)0128303 |
|
materialman |
Xu Shihua |
Engineer |
Work permit |
0441811194418007726 |
|
documenter |
He Xiaolei |
Engineer |
Work permit |
0441811494418014490 |
|
Cost engineer |
Huang Chengsong |
Engineer |
Certified Cost Engineer Certificate |
建[造]11224400014428 |
|
Survey responsibility 人 |
孙淼 |
Advanced engineering 师 |
Registered Civil Engineer (Geotechnical) |
AY154100538 |
|
Design responsibility 人 |
王阔 |
High grade building 师 |
Grade I registered architect |
20186200335 |
|
Architecture major Person in charge |
丁雪 |
Advanced engineering 师 |
Grade I registered architect |
20215102480 |
|
Structure major Person in charge |
Lin Yubin |
Advanced engineering 师 |
Class I Registered Structural Engineer |
S195103056 |
|
Hvac professional director |
宛超 |
Senior engineer |
Registered Utility Engineer (HVAC) |
CN185100520 |
|
Head of water supply and drainage
|
Shi Qianzhong |
Senior engineer |
Registered Utilities Engineer (Water Supply and Drainage) |
CS195100810 |
|
Electrical major Person in charge |
Zhong Yuyu |
Advanced engineering 师 |
Registered Electrical Engineer (Power Supply and Distribution) |
DG195100963 |
|
Technology major Person in charge |
Chen Zhaoqiang |
Engineer |
Registered Utility Engineer (Power)
|
CD185300044 |
The second bid: Tongxu County Dasanggou agricultural and sideline products service center construction project cost of the whole process
Bid the full name of the candidate |
人员 类别 |
姓名 |
职务 |
Certificate name |
Certificate number |
Zhongxing Yu Construction Management Co., LTD |
Professional technical personnel |
徐文 |
Senior engineer |
Grade I registered cost Engineer |
建[造]11014100006034 |
Professional technical personnel |
Ai Meng Meng |
Engineer |
Grade I registered cost Engineer |
建[造]11184100009940 |
|
Professional technical personnel |
李杰 |
Senior engineer |
Grade I registered cost Engineer |
建[造]11014100005921 |
|
Professional technical personnel |
Lu Hexiang |
Engineer |
Grade I registered cost Engineer |
建[造]11214100003169 |
|
Professional technical personnel |
Li Huaqiong |
Engineer |
Grade I registered cost Engineer |
建[造]11214100003211 |
|
Professional technology 人员 |
Zhang Huanli |
Engineer |
Grade I registered cost Engineer |
建[造]11124100001761 |
|
Professional technology 人员 |
Song Shuxia |
Senior engineer |
Grade I registered cost Engineer |
建[造]14204100000392 |
|
Professional technical personnel |
Dong Chuangju |
Assistant engineer |
Grade I registered cost Engineer |
建[造]14234100015176 |
|
Zhong-hongye Engineering Consultants Limited |
Civil construction cost engineer |
Li Weifeng |
高工 |
Registered cost engineer |
建[造]110941 00005733 |
Civil engineer |
Li Changzeng |
高工 |
Registered cost engineer |
建[造]110241 00011581 |
|
Civil engineer |
Fu Haitao |
高工 |
Registered cost engineer |
建[造]111241 00002312 |
|
Civil engineer |
高稳 |
高工 |
Registered cost engineer |
建[造]110741 00016222 |
|
Civil engineer |
左源 |
Engineer |
Registered cost engineer |
建[造]111941 00010914 |
|
Installation engineer |
马龙 |
/ |
Registered cost engineer |
建[造]14234100014716 |
|
Installation engineer |
Tian Yongjie |
/ |
Registered cost engineer |
建[造]14224100008878 |
|
Henan Province Jialong project management Co., LTD |
Project leader |
Xu Jiaping |
Senior engineer |
Grade I registered cost Engineer |
建【欧洲杯买球赛平台】11024100011097 |
Department director |
Li Junli |
Senior engineer |
Grade I registered cost Engineer |
建【欧洲杯买球赛平台】11204100001617 |
|
Department director |
Zhai Hongli |
Senior engineer |
Grade I registered cost Engineer |
建【欧洲杯买球赛平台】11164100002048 |
|
Department director |
田川 |
Engineer |
Grade I registered cost Engineer |
建【欧洲杯买球赛平台】11044100002240 |
|
Professional personnel |
陈艳 |
Engineer |
Grade I registered cost Engineer |
建【欧洲杯买球赛平台】11164100002049 |
|
Professional personnel |
Zhao Xinfa |
Engineer |
Grade I registered cost Engineer |
建【欧洲杯买球赛平台】11234100013027 |
|
Professional personnel |
Xu Ranran |
Engineer |
Primary registration Cost engineer |
建【欧洲杯买球赛平台】11184100010821 |
|
Professional personnel |
Fu Pengfei |
Engineer |
Grade I registered cost Engineer |
建【欧洲杯买球赛平台】11214100003136 |
|
Professional personnel |
董慧 |
/ |
Grade I registered cost Engineer |
建【欧洲杯买球赛平台】11164100002034 |
|
Professional personnel |
Fu Wenyan |
/ |
Grade I registered cost Engineer |
建【欧洲杯买球赛平台】11204100000194 |
|
Professional personnel |
Yang Jiexue |
/ |
Grade I registered cost Engineer |
建【欧洲杯买球赛平台】11194100014494 |
|
Professional personnel |
Xu Xueling |
/ |
Grade I registered cost Engineer |
建【欧洲杯买球赛平台】14104100012948 |
|
Professional personnel |
Hao Chunling |
/ |
Grade I registered cost Engineer |
建【造14224100012970 |
|
Professional personnel |
Li Tengfei |
/ |
Grade I registered cost Engineer |
建【欧洲杯买球赛平台】13221151014944 |
|
Professional personnel |
Peng Yanping |
/ |
Grade I registered cost Engineer |
建【欧洲杯买球赛平台】12234154018301 |
|
Professional personnel |
Im Yingchuan |
/ |
Grade I registered cost Engineer |
建【欧洲杯买球赛平台】11024100011097 |
|
Henan Haina construction management Co., LTD |
Civil engineering major |
Zhang Haiyan |
Senior engineer |
Registered cost engineer |
建[造]1114 4100011315 |
Civil engineering major |
Xu Xueli |
Senior engineer |
Registered cost engineer |
建造]111941 00013537 |
|
Civil engineering major |
Li Gengtao |
Senior engineer |
Registered cost engineer |
建[造]11174 100002675 |
|
Civil engineering major |
苗熠 |
Senior engineer |
Registered cost engineer |
建[造]11204 100000093 |
|
Civil engineering major |
秦勇 |
Senior engineer |
Registered cost engineer |
建[造]11184 100010615 |
|
Installation specialty |
Liu Ruixia |
Senior engineer |
Registered cost engineer |
建[造]14214 100004926 |
|
Installation specialty |
Han Zhenhua |
Senior engineer |
Registered cost engineer |
建[造]142341 00015425 |
|
Jianda Guoxin Engineering management Co., LTD |
注册 造价 师 |
Sun Liming |
高级 |
高级 |
建【欧洲杯买球赛平台】11234100013158 |
Certified cost engineer |
Jin Hongjun |
/ |
/ |
建【欧洲杯买球赛平台】1103410005766 |
|
Certified cost engineer |
李曼 |
中级 |
中级 |
建【欧洲杯买球赛平台】19410009293 |
|
Certified cost engineer |
Ma Xiaowen |
/ |
/ |
建【欧洲杯买球赛平台】07410003565 |
|
Certified cost engineer |
Zhang Pengfei |
/ |
/ |
建【欧洲杯买球赛平台】11194100013264 |
|
Certified cost engineer |
Liu Yabian |
/ |
/ |
建【欧洲杯买球赛平台】14234100015930 |
|
Certified cost engineer |
Li Fengming |
/ |
/ |
建【欧洲杯买球赛平台】11193400007213 |
|
Certified cost engineer |
Lu Lili |
/ |
/ |
建【欧洲杯买球赛平台】13231151000714 |
|
Zhongyuan Tianwei Group Co. LTD |
土建 |
陈莉 |
Engineer |
Cost engineer I |
建 [造]111952 00005320 |
安装 |
Song Jingming |
Engineer |
Cost engineer I |
建 [造]142252 00003394 |
The third section: Tongxu County Dasanggou agricultural and sideline products service center construction project supervision
Bid the full name of the candidate |
Personnel category |
姓名 |
职务 |
Certificate name |
Certificate number |
Sino-singapore Huadu International Engineering Consulting Co., LTD |
Chief supervision engineer |
Li Yanduan |
Chief supervision engineer |
National registration certificate |
41002827 |
Professional supervision engineer |
Liu Yongtao |
Professional supervision engineer |
National registration certificate |
41009360 |
|
Professional supervision engineer |
Wang Kaijiang |
Professional supervision engineer |
National registration certificate |
41007731 |
|
supervisor |
Wang Huanjing |
supervisor |
Supervisor post certificate |
21106416 |
|
supervisor |
Zhang Danhui |
supervisor |
Supervisor post certificate |
21101609 |
|
Zhongyu Hengxin Engineering Consulting Co., LTD |
Chief supervision engineer |
Wang Shaodong |
Chief supervision engineer |
Certificate of registered Supervision Engineer |
00497981 |
Chief supervision engineer representative |
Liu Gencheng |
Chief supervision engineer representative |
Certificate of registered Supervision Engineer |
00478054 |
|
Professional supervision engineer |
Zhou Guanpeng |
Professional supervision engineer |
Certificate of registered Supervision Engineer |
00714321 |
|
Professional supervision engineer |
Chen Xiaoli |
Professional supervision engineer |
Certificate of registered Supervision Engineer |
00531487 |
|
Professional supervision engineer |
Du Pengwei |
Professional supervision engineer |
Certificate of registered Supervision Engineer |
00523746 |
|
supervisor |
Feng Panpan |
supervisor |
Supervisor post training certificate |
22201468 |
|
supervisor |
常沙 |
supervisor |
Supervisor post training certificate |
22201470 |
|
witness |
Hou Linlin |
witness |
Witness post training certificate |
H41180051200004 |
|
Yutong Engineering Management Co., LTD |
Chief supervision engineer |
Xu Yongjin |
Registered supervision engineer |
Certificate of registered Supervision Engineer |
00392274 |
Director's representative |
He Yahui |
Registered supervision engineer |
Certificate of registered Supervision Engineer |
00420648 |
|
Professional supervision engineer1 |
张杨 |
Registered supervision engineer |
Certificate of registered Supervision Engineer |
00494599 |
|
Professional supervision engineer2 |
Wang Xiaowei |
Registered supervision engineer |
Certificate of registered Supervision Engineer |
00473311 |
|
Cost engineer |
Wang Zonghan |
Cost engineer |
Grade I Cost Engineer Certificate |
建[造]11084 100002098 |
|
supervisor |
Bai Xueyu |
supervisor |
Supervisor certificate |
20202098 |
|
Safety officer |
Xue Zhipeng |
Safety officer |
Safety officer certificate |
H4117001 0006712 |
|
witness |
刘罡 |
witness |
Witness card |
H4115005 0000009 |
|
documenter |
Gogginga |
documenter |
Reference card |
0411711494117002507 |
|
Zhengzhou Zhongcheng Construction consulting Co., LTD |
总监 |
海磊 |
总监 |
Registration certificate |
00423274 |
Director's representative |
Hao Jingjing |
Director's representative |
Registration certificate |
00459248 |
|
Professional supervision engineer |
Wang Bowen |
Professional supervision engineer |
Registration certificate |
00665410 |
|
Professional supervision engineer |
Yang Xuezhen |
Professional supervision engineer |
Registration certificate |
00489158 |
|
Professional supervision engineer |
Wang Huiding |
Professional supervision engineer |
Registration certificate |
00461854 |
|
Registered cost engineer |
Lv Zhihan |
Registered cost engineer |
Registration certificate |
00625243建[造]11194100013519 |
|
National registered safety engineer |
Kong Defeng |
National registration Safety engineer |
Safety officer post certificate |
2014033320332014320201000140 |
|
supervisor |
Li Pengtao |
supervisor |
Supervisor certificate |
19202695 |
|
witness |
Wang Fengyong |
witness |
Witness position certificate |
H41160050000303 |
|
documenter |
Shen Yanfang |
documenter |
Document clerk certificate |
41171140103611 |
|
Henan provincial city investment project management Co., LTD |
Chief supervision engineer |
Yuan Jianwei |
Chief supervision engineer |
Registered supervision engineer registered practice certificate |
00740872 |
Director's representative |
Yang Yuesheng |
Director's representative |
Registered supervision engineer registered practice certificate |
00491842 |
|
Professional supervision engineer |
刘坤 |
Professional supervision engineer |
Registered supervision engineer registered practice certificate |
00827922 |
|
Professional supervision engineer |
彭勇 |
Professional supervision engineer |
Registered supervision engineer registered practice certificate |
00655076 |
|
Cost engineer |
Zhou Lixia |
Cost engineer |
Grade I cost Engineer registration certificate |
建[造]11224100007708 |
|
supervisor |
石坤 |
supervisor |
Supervisor's certificate |
20201073 |
|
documenter |
Guo Chenghui |
documenter |
Reference clerk's certificate |
2201050000035715 |
|
witness |
张祥 |
witness |
Witness certificate |
2201170000310590 |
|
Safety officer |
Zhang Heyi |
Safety officer |
Safety officer certificate |
2201020000029846 |
|
Jingyuan International Engineering Consulting Co., LTD |
Project director |
Wang Mingli |
Project director |
Certificate of registered Supervision Engineer |
00307747 |
Director's representative |
Xue Pengfei |
Director's representative |
Certificate of registered Supervision Engineer |
00450025 |
|
Professional supervision engineer |
Xie Yanbin |
Professional supervision engineer |
Certificate of registered Supervision Engineer |
00518796 |
|
Professional supervision engineer |
Gao Weinan |
Professional supervision engineer |
Certificate of registered Supervision Engineer |
00387402 |
|
Professional supervision engineer |
Wei Baocheng |
Professional supervision engineer |
Certificate of registered Supervision Engineer |
00397423 |
|
Professional supervision engineer |
CAI Bingkun |
Professional supervision engineer |
Certificate of registered Supervision Engineer |
00539478 |
|
Professional supervision engineer |
王静 |
Professional supervision engineer |
Registered Supervision Engineer Certificate Registered Cost Engineer Certificate |
00516158建【欧洲杯买球赛平台】11214100003950 |
|
supervisor |
Wen Mengxin |
supervisor |
Henan Provincial supervisor Certificate |
20201230 |
|
witness |
李俊 |
witness |
Henan Province Witness card |
Y041230020 0900032 |
|
Safety officer |
Ratian |
Safety officer |
Henan Province safety officer certificate |
Y04123009 00900082 |
|
Zhongxing Yu Construction Management Co., LTD |
Project director |
Wei Xiaodong |
Project director |
National registered supervision engineer certificate |
41006246 |
Registered supervision engineer |
Gao Fuqing |
Director's representative |
National registered supervision engineer certificate |
41011596 |
|
Registered supervision engineer |
李宁 |
Professional supervision engineer |
National registered supervision engineer certificate |
41015986 |
|
supervisor |
陈霄 |
supervisor |
Supervisor certificate |
22201463 |
|
documenter |
张翠 |
documenter |
Reference card |
0411511494115001516 |
|
witness |
裴环 |
witness |
Witness card |
H41180050000211 |
|
Safety officer |
Wang Lihua |
Safety officer |
Safety officer certificate |
H41170010100447 |
|
Zhongding Jinghong Engineering Management Co., LTD |
Registered supervision engineer |
Zhang Jingzhuo |
Project director |
Certificate of registered Supervision Engineer |
41009996 |
Registered supervision engineer |
Zhang Pingyuan |
Director's representative |
Certificate of registered Supervision Engineer |
41008448 |
|
Registered supervision engineer |
Wu Zhenyu |
Civil engineering professional supervision engineer |
Registered supervision engineer certificate |
41003773 |
|
Registered supervision engineer |
Dai Qingbin |
Civil engineering professional supervision engineer |
Certificate of registered Supervision Engineer |
41008459 |
|
Registered supervision engineer |
李瑶 |
Installation professional supervision engineer |
Certificate of registered Supervision Engineer |
11010538 |
|
Registered cost engineer |
Fan Qingyu |
Registered cost engineer |
Certified Cost Engineer Certificate |
建[造]20410011478 |
|
Registered supervision engineer |
Zhao Shiju |
Safety officer |
Registered supervisor Master certificate, Ann Full staff card |
41012900、H41170010103861 |
|
supervisor |
Zhu Yuanyuan |
supervisor |
Supervisor certificate |
20202200 |
|
documenter |
崔松 |
documenter |
Reference card |
2101050000192634 |
|
Zhongyun Tianlong Engineering Group Co., LTD |
Chief supervision engineer |
Lv Zhenyu |
Chief supervision engineer |
Registered supervision engineer |
41005966 |
Director's representative |
Wei Yichang |
Director's representative |
Registered supervision engineer |
41020822 |
|
Professional supervision engineer |
郭晓 宇 |
Professional supervision engineer |
Professional supervision engineer |
19104978 |
|
Professional supervision engineer |
Renhao Chen |
Professional supervision engineer |
Professional supervision engineer |
19106758 |
|
supervisor |
Mazecun |
supervisor |
supervisor |
20201259 |
|
documenter |
Song Yapeng |
documenter |
documenter |
41171140002592 |
|
witness |
Zhang Mengqiu |
witness |
witness |
H41150050000326 |
|
Safety officer |
Chen Zhimin |
Safety officer |
Safety officer |
H41150010004415 |
|
Henan Everbright Construction management Co., LTD |
Chief supervision engineer |
Cui Sishu |
高工 |
Certificate of registered Supervision Engineer |
00268986 |
Director's representative |
郭森 |
Engineer |
Certificate of registered Supervision Engineer |
00646189 |
|
Professional supervision engineer |
Feng Jingshuai |
高工 |
Certificate of registered Supervision Engineer |
00469620 |
|
Professional supervision engineer |
刘硕 |
高工 |
Certificate of registered Supervision Engineer |
00553111 |
|
Full-time safety officer |
Sun Yanpeng |
高工 |
Safety officer certificate |
Y041230090 0200075 |
|
supervisor |
Guo Yukai |
Engineer |
Supervisor certificate |
19200787 |
|
Phalanx Engineering Consulting Co. LTD |
Chief supervision engineer |
Ding Guixing |
Chief supervision engineer |
Certified supervisor engineer |
00421741 |
Chief supervision engineer representative |
Li Zhaofeng |
Chief supervision engineer representative |
Certified supervisor engineer |
00427155 |
|
Professional supervision engineer |
张辉 |
Professional supervision engineer |
Certified supervisor engineer |
00587785 |
|
supervisor |
袁伟 |
supervisor |
Supervisor certificate |
2101060000128753 |
|
supervisor |
Shin Nocheon |
supervisor |
Supervisor certificate |
2101060000128720 |
|
witness |
Dong Xingyi |
witness |
Witness card |
H41170050 000373 |
|
documenter |
梁芳 |
documenter |
Reference card |
2201050000276854 |
|
Safety officer |
Shen Xiuxia |
Safety officer |
Safety officer certificate |
2001020071514 |
4.3 Evaluate the candidate's business performance
The first section: Tongxu County Dasanggou agricultural and sideline products service center construction projectEPCGeneral contract
Bid the full name of the candidate |
Project name |
Full name of the construction unit |
Contract date |
Contract amount(元) |
Name of project manager |
Guizhou Zhongjian Weiye Construction (Group) Co., LTD |
Danzhai County Jinhua Industrial Park Logistics Park construction project (EPCGeneral contract) |
Danzhai County urban construction investment development Co., LTD
|
2021.11.5
|
240000000元
|
Yang Xiulin
|
Ruzhou North Fuchunshan pastoral complex design and constructionEPCGeneral contract
|
Ruzhou Huatian cultural tourism development Co., LTD
|
2023.1.18
|
4495500000元
|
李翔 |
|
Guangzhou fourth construction engineering Co., LTD |
Telecom south baseA3A4General contract for construction of civil engineering project of building communication machine building |
China Telecom Group Limited Guangdong branch |
2020年6月8日 |
296261405.93 |
Lin Jingchang |
General contract for survey, design and construction of student apartment project in East South Campus of Sun Yat-sen University Guangzhou Campus |
Guangzhou key public construction project management center |
2020年5月9日 |
232149448.87 |
Li Shaolong |
|
Jieyang Institute of Technology first phase project design and construction general contract |
Jieyang City Yuedong New City urban construction bureau |
2020年3月15日 |
1266915428.42 |
Chen Jiawei |
|
Guangzhou Baiyunshan Mingxing Pharmaceutical Co., Ltd. to change the project (Phase I) planning adjustment and increase supporting engineering construction general contract |
Guangzhou Baiyun Mountain Mingxing pharmaceutical Co., LTD |
2022年7月18日 |
204036695.36 |
Chen Jiahui |
|
Jinlai Technology (Huizhou) magnetic components manufacturing project survey design construction general contract |
Huizhou Jinlai Industrial Co., LTD |
2022年5月19日 |
3552526848.00 |
Huang Yanmei |
|
Qianwei County Cuiping Mountain rehabilitation and pension construction project design and construction general contract EPC |
Sichuan Jinqian State-owned Assets Investment Group Co., LTD |
2023年5月 |
327676608.00 |
杨程 |
|
Xi 'an Aerospace Construction Group Co., LTD |
Aeropolis · LAN Yuan Project Construction (Phase II) |
Xi 'an aviation base Qihang Real Estate Co., LTD |
2020年5月8日 |
212938203.57 |
李远 |
Pengshan District agricultural and sideline products cold chain storage and distribution base project design and construction General contract (EPC) |
Meishan City Pengshan District family farm alliance development service Co., LTD |
2022年12月30日 |
Design fee(含税) 为 :910000.00元 |
Gu Yangjia |
|
Guizhou Construction Engineering Group Third construction engineering Co., LTD |
Construction of Qingzhen prison construction project in Guizhou Province |
Guangshun Prison, Guizhou Province |
2020-6-28 |
212257253.23 |
Shin Donghua |
Guiyang Guanshanhu District ecological food Industrial Park standard plant and supporting infrastructure construction project design, construction general contract |
Guiyang Guanshan Lake industrial investment food industrial Park construction investment Co., LTD |
2022-10-10 |
695784854.30 |
Chen Shouzhong |
|
Shanghai Harbor modern cold chain logistics global center project |
Shanghai Tianhuan cold chain Logistics Co., LTD |
2021-1 |
2000000 |
Zhao Tongyu |
|
Fujian Lugang (Group) Co., LTD |
Quanzhou Taiwan investment zone business operation center |
Fujian Hongwan real estate development Co., LTD
|
2020.5.10
|
460000000
|
Huang Shaohuang
|
Guangdong Dianbai Construction Group Co., LTD
|
Xizang Zhongxing Trade international integrated Industrial Park project design |
Xizang Zhongxing trade logistics Industry Development Group Co., LTD |
2020年9月 |
5000000.00 |
王阔 |
Nansha of Guangzhou2018NJY -12General contract for survey, design and construction of land parcel project |
Guangzhou Nanhong Real Estate Development Co., LTD |
2021年2月25 日 |
552244661. 20 |
Zhang Lin |
Bid the full name of the candidate |
Project name |
Full name of the construction unit |
Contract signing time |
Contract amount(元) |
Name of project manager |
Zhongxing Yu Construction Management Co., LTD |
The cost consulting service project of the Chinese Character Museum |
Chinese writing museum 馆 |
2020.1.3 |
2743180 |
徐文 |
Jinggangshan agricultural high-tech industrial Demonstration zone food Research Institute project construction stage whole process cost consulting services |
Jinggangshan Agricultural Science and Technology Park Management Committee |
2022.1.6 |
818000 |
Jia Shijun |
|
Yuanhui District mass cultural activities service center project |
Luohe Xianglong Asset Management Co., LTD |
2020.4.7 |
3070000 |
徐文 |
|
Zhong-hongye Engineering Consultants Limited |
Xi 'an First Hospital relocation and high-tech zone public health center project cost consulting services |
Xi 'an High-tech Link Health Hospital management Co., LTD |
2020.11.26 |
2746307.41 |
Li Weifeng |
Kunming Dianchi International Health Demonstration City2-1 The whole process cost consulting service project contract |
Kunming Greenland Dianhai Property Co., LTD |
2020.9.16 |
2216699.10 |
Fu Haitao |
|
Zhonghe Science and Innovation Industrial Park project |
Dengfeng Tiandi real Estate limited |
2022.1.17 |
800 万 |
Li Weifeng |
|
Nanyang Zhongguancun Innovation and Entrepreneurship Technology City phase I project |
Nanyang high-tech development Investment Group Co., LTD |
2020.8.25 |
/ |
Ma Chenxia |
|
Henan Province Jialong project management Co., LTD |
Kaifeng City Federation of Trade Unions staff support activity center construction project and outdoor supporting projects |
Kaifeng Federation of trade unions |
2023 年 7 月 24 |
10039593.61 |
Xu Jiaping |
Tongxu county 2022 Urban old residential renovation project |
Tongxu County urban and rural and live Housing and Construction Bureau |
2022 年 6 月 10 |
32467502.22 |
Xu Jiaping |
|
Henan Haina construction management Co., LTD |
Xinxiang intelligent robot Industrial Park project whole process consulting services |
Xinxiang Weibin Industrial Park development Co., LTD |
2020-12-23 |
3800000 |
Tian Zhanling |
Zhoukou Port area future home phase 6A Shantytown renovation project (two districts) whole process engineering consulting services |
Zhoukou port logistics Park construction development Co., LTD |
2022-05-06 |
10000000 |
Zhang Qingjiu |
|
March 3rd Avenue and its extension line construction project (whole process cost consulting) |
Wuzhishan City housing and urban-rural development Bureau |
2022-12-20 |
2281832 |
Xu Xueli |
|
Tangshan city, the whole area of water control water run city county project ppp Project Luanan County project (Phase II) cost consultation Section II |
Luannan County water resources Bureau |
2022-09-09 |
90869688 |
Zhang Haiyan |
|
Jianda Guoxin Engineering management Co., LTD |
The whole process tracking audit and final accounting audit of the West District heating project of Kaifeng cogeneration unit technical transformation |
Kaifeng City finance heating Co., LTD
|
2020.7.13
|
约 94400 万 元
|
Sun Liming
|
Zhongyuan Tianwei Group Co. LTD |
Sihui Guyi Bi Dao Gallery construction project cost consulting services |
Sihui city agent construction project management center |
2021 年 8 月 15日 |
113009.89 |
Yin Zhiming |
A house renovation construction project cost consulting in Metuo |
Chinese People's Liberation Army 77650 部队 |
2022 年 9 月 10日 |
29700.00 |
陈莉 |
|
Xinwei town, Huiyang District 2021 Water environment quality consolidation and improvement project--Dingshan River basin procurement budget preparation service contract |
Xinwei Town People's government, Huiyang District, Huizhou city |
2021 年 10 月 8 日 |
97300.00 |
陈莉 |
|
Deqing County Yuecheng Yongzeng village centralized water supply construction project |
Deqing County Yue town Yongzeng village villagers committee |
2021 年 11 月 30日 |
8640.00 |
Yin Zhiming |
|
Xinwei town, Huiyang District 2021 Water environmental quality consolidation and improvement project - Hengling water and Huangsha River basin procurement budget preparation services |
Xinwei Town People's government, Huiyang District, Huizhou city |
2021 年 10 月 28 日 |
42000.00 |
陈莉 |
|
Xinwei town, Huiyang District 2021 Water environment quality consolidation and improvement project - Tunzi River basin procurement budget preparation service |
Xinwei Town People's government, Huiyang District, Huizhou city |
2021 年 10 月 8日 |
46700.00 |
陈莉 |
The third section: Tongxu County Dasanggou agricultural and sideline products service center construction project supervision
Bid the full name of the candidate |
Project name |
Full name of the construction unit |
Contract signing time |
Contract amount(元) |
Sino-singapore Huadu International Engineering Consulting Co., LTD |
Xuchang City Jian 'an District People's Hospital and CDC Project (second phase) |
Xuchang City Jian 'an District national medical management Co., LTD |
2022.8 |
6410363.93 元 |
Sf Zhengzhou E-commerce Industrial Park phase II project supervision |
Zhengzhou Fengtai e-commerce Industrial Park management Co., LTD |
2020.2 |
949300 元 |
|
Luoning County People's Hospital branch2#4#6#7#Building No. 1 and Public Health Medical Centre (Infectious Diseases Outpatient Ward building) Engineering supervision |
Luoning County People's Hospital, Luoyang Xincheng Industrial Co., LTD |
2021.8.17 |
855000 元 |
|
TCL Central China E-commerce distribution Center phase II |
Lejia Storage (Zhengzhou) Co., LTD |
2020.7 |
1600000 元 |
|
Zhongyu Hengxin Engineering Consulting Co., LTD |
Henan Xuchang bonded logistics 心(B Type) item |
Construction of Xuchang New District Investment company limited |
2020 年 10 月 20 日 |
In accordance with the budget Review of construction and installation workers travel-cost 0.88% 计取 |
Kaifeng Xiangfu district education park District construction project |
Kaifeng Xiangfu District State Investment cultural tourism development Co., LTD |
2021 年 11 月 1日 |
Total project construction and installation cost approved in the final account × the bid rate of supervision (1.66%Uppercase: a hundredth of land) |
|
Jingtai Intelligent Terminal (Zhoukou) Industrial Park project |
Jingtai (Henan) Electronic Technology Co., LTD |
2022 年 3 月 1 7 日 |
70 万元 |
|
Yutong Engineering Management Co., LTD |
2021Jiyuan smart agriculture vegetable industry Demonstration Park project |
Jiyuan City Lilin town people's government |
2021.8.28 |
348700.00 元 |
Lushan City Science and Technology Park (Phase I) item Project (design, construction, mining 购)EPC Project general contract supervision project |
Lushan Industrial Development science and technology Park development Co., LTD |
2020.9.25 |
4935900.00 元 |
|
Dexing Xiangtun Park dangerous logistics Industrial Park infrastructure and supporting construction project - comprehensive building and storage and other supporting construction EPC Project supervision |
Dexing City industrial investment investment development Co., LTD |
2023.8.31 |
1228300 元 |
|
Zhengzhou Zhongcheng Construction consulting Co., LTD |
Phase II construction project of the New District Branch of Xixian Second People's Hospital (EPC)(Second lot) |
Xixian second People's Hospital |
2020.1.19 |
2835000.00 元 |
Shenjiazhai school expansion project supervision section |
Xining Phoenix Investment development Co., LTD |
2020.4.27 |
1960000.00 元 |
|
Xixian Second Medical and Health Service Group elderly Care Center construction project (EPC(Second lot) |
Xixian second People's Hospital |
2020.5.26 |
2340000.00 元 |
|
Henan provincial city investment project management Co., LTD |
Zunyi Hualaijin Automobile trade Co., LTD 4S Store construction project |
Zunyi Hualaijin Automobile trade Co., LTD |
2023 年 4 年 14日 |
Eighty thousand yuan only |
Hefu Village Committee Dafu pig breeding site construction project construction supervision |
Renhua County Zhenghe agriculture and animal husbandry Co., LTD |
2022 年 8 月 4 日 |
1186000.00 元 |
|
Manganya City kindergarten "factor law" construction project |
Mangya City Education and science and Technology Bureau |
2023 年 8 月 1 日 |
87681.69 元 |
|
Xiuwu County Zhouzhuang Town Zhanggongpu central primary school donation project |
Xiuwu County Zhouzhuang town Zhanggongpu central primary school |
2023 年 1 月 14日 |
283000.00 元 |
|
Henan Province 53 farm logistics security check center construction project supervision |
Wusan Farm in Henan Province |
2023 年 10 月 7日 |
280000.00 元 |
|
Luanchuan County housing and urban-rural development Bureau Luanchuan County high cliff head protective rental housing construction project supervision |
Luanchuan County housing and Urban and rural construction Bureau |
2023 年 6 月 9 日 |
505699.00 元 |
|
Jingyuan International Engineering Consulting Co., LTD |
Civil Bonded Logistics Center (B Type) item |
Minquan County Datong bonded logistics Co., LTD |
2020.04.15 |
The bid price of the construction section 1.29% |
Xinxiang City Fengquan district industrial agglomeration area B 区 9#、14#、24#、25#、 30#Standardized plant construction and supervision engineering section three |
Xinxiang Fengquan Lake Industrial Co., LTD |
2020.01.16 |
费率 0.395% |
|
International artificial intelligence science and technology park project supervision |
Zhengxin labor in Henan province Intelligent company limited |
2020.12.11 |
6806520.00 |
|
Huainan clean energy storage and transportation equipment system Industrial park project 4#Standardized plant supervision |
Huainan city industrial development (Group) Limited company 司 |
2020.12.31 |
864500.00 |
|
Kaifeng Free Trade • Innovation Center 1 Integrated Business Technology Office,2 No. Matching room,3 No. Hotel Sports Center,4 No. Complex building, underground garage project |
Kaifeng New district infrastructure Construction investment is limited 公司 |
2020.03.09 |
2639000.00 |
|
Henan Lihua Pharmaceutical Co., Ltd. Tangyin new project phase I A Construction supervision of construction projects |
Henan Lihua Pharmaceutical Co., LTD |
2023.02.15 |
349500.00 |
|
Zhongxing Yu Construction Management Co., LTD |
Xinxiang clean government education base construction project supervision |
中国共产党新乡市纪律检查委员会 |
2020.2.17 |
3128389.9 |
Erqi District elderly service facilities comprehensive project supervision |
Zhengzhou Erqi urban and rural renewal construction development Co., LTD |
2021.3.2 |
The contract signing rate is1.504% |
|
Zhongding Jinghong Engineering Management Co., LTD |
Supervision of construction of new project in different site of Mengzhou Maternal and Child Health Hospital |
Mengzhou maternal and child health care hospital |
2020 年 1 月 10日 |
950000.00 元 |
Dongfang maternal and child health hospital renovation and expansion project |
Dongfang maternal and child Health Hospital |
2020 年 12 月 14日 |
3234519.88 元 |
|
Former city Public Security Bureau office building Building and lifting project |
Kaifeng cultural Tourism Investment Group Co., LTD |
2022 年 6 月 20日 |
833150.00 元 |
|
Zhengzhou high-tech smart Industrial Park phase II project supervision services |
Zhengzhou high-tech Investment Holding Group Co., LTD |
2021 年 11 月 22日 |
5623200 元 |
|
Zhongyun Tianlong Engineering Group Co., LTD |
Weishi Heyi village bank integrated office headquarters 1#Loh Hay Yip Building and basement works |
Weishi Heyi Village Bank Co., LTD |
2020 年 6 月 28日 |
1200000.00元 |
Hubin district science and technology innovation service building project |
Sanmenxia Hubin state-owned capital Investment operation Co., LTD |
2021 年 4 月 28日 |
0.99%-约1220 000.00 元 |
|
Luohe Economic and Technological Development Zone China (Luohe) Intelligent Food Equipment Industrial Park Project 一期)A District supervisor |
Luohe Economic Development Zone Investment development Co., LTD |
2021 年 5 月 6 日 |
Project construction costs 0.546%-约239 0000.00 元 |
|
Henan Henan land port integrated logistics port project headquarters base project |
Xuchang land port industrial Co., LTD |
2021 年 8 月 31日 |
0.65%-344500 0.00 元 |
|
Construction project of Hydraulic Industrial Park Phase II of Luohe Economic and Technological Development Zone (A District supervision |
Luohe Economic and technological Development Zone Xinda Urban Construction Investment Co., LTD |
2023 年 3 月 22日 |
0.546%-81900 0.00 元 |
|
Xinxiang City education Bureau Xinxiang City experimental high school EPC General contract project supervision project |
Xinxiang City Education Bureau |
2023 年 2 月 24日 |
6650000.00元 |
|
Henan Everbright Construction management Co., LTD |
Hebi discipline inspection and supervision integrated business housing project general contract(EPC) and supervision |
Hebi discipline inspection, supervision and education base |
2020.3.9 |
2037000 元 |
Supervision of talent incubation base of Puri Ecological Park |
Chongqing Puri Development and Investment Group Co., LTD |
2020.12.11 |
5890539 元 |
|
Phalanx Engineering Consulting Co. LTD |
Bauhinia Science Park science and technology venue exhibition design and decoration integration project supervision project |
Zhengzhou high-tech zone Zijing Network information security technology Park |
2020.5.29 |
1275986 元 |
Jiaxian Center for Disease Control and Prevention business housing construction and supporting facilities project construction and supervision |
Jiaxian Center for Disease Control and Prevention |
2022.4.22 |
1.9% |
|
Boao Airport domestic terminal infrastructure renovation and customs supervision supporting inspection equipment and facilities project supervision |
Hainan Boao Airport Co., LTD |
2022.7.28 |
999900.00 元 |
|
Luohe city Yuanhui district secondary professional school standardization construction(Teaching building construction)项目 |
Luohe city Yuanhui district secondary professional school |
2021.8.8 |
247500 元 |
|
Zhengyang County grassroots medical public health service capacity improvement project |
Zhengyang County health and sports Committee |
2023.4.17 |
1337000 元 |
4.4 Determine the qualifications of candidates to respond to the requirements of the bidding documents
4.4.1 Qualifications required by the bidding documents
序号 |
Qualifications and abilities |
1 |
3.1Section 1: 3.1.1Qualification requirements: The enterprise has independent legal personality,And should have a valid business license (joint bid,Each party to the consortium shall provide);Must have at the same time ① must have a valid building engineering construction general contracting level and steel structure engineering professional contracting level 2 and above qualifications,And have a valid safety production license issued by the relevant industry authorities;2.Effective construction administrative department issued with engineering design comprehensive Class A qualification,Or have both engineering design and construction industry (construction engineering) Grade A and engineering design commercial food industry Grade A qualification,Or have both engineering design and construction industry (construction engineering) Grade A and engineering design commercial food industry refrigeration engineering professional Grade A qualification;③ with engineering investigation professional class (geotechnical engineering (investigation)) grade B or above or engineering investigation comprehensive class A qualification;(If the consortium bids, ① it shall be provided by the consortium construction party;② Provided by the consortium designer;③ Provided by the consortium surveyor),The overall qualification of the consortium shall meet the qualification requirements of bidders in the bidding documents。 3.1.2Personnel requirements: The project leader has the qualification of a registered construction engineer in the construction engineering profession, and has an effective safety production assessment certificate (BCertificate);And did not act as the project manager of other projects under construction and issued a no-construction commitment;The general contracting project manager and the construction project manager can be the same person (if the contract project undertaken by the general contracting project manager and the construction project manager has been completed or the modification procedures are complete and other circumstances meet the requirements),Corresponding supporting materials shall be provided in the bidding documents,It can be regarded as no construction in progress,Those submitted after the deadline for submission of tender documents will not be accepted);The person in charge of the survey shall have a registered civil engineer (geotechnical);The person in charge of the design must have a Grade I registered architect;The general contracting project manager, construction project manager, survey person in charge, design person in charge, and authorized client must be a regular employee of the unit,Need to provide2023年1月1sun-to-day3Proof of monthly social security payments。 3.1.3Financial requirements: The financial situation is good, and there is no property being taken over or frozen;Bidder must provide must provide business2020年度、2021年度、2022The annual financial audit report (including balance sheet, cash flow statement and income statement) audited by an accounting firm or audit institution. If the enterprise is newly established less than one year ago, it shall provide the financial statements since its establishment。(The consortium leader must provide, other consortium members do not require)。 3.1.4The project accepts the bid of the consortium。 3.1.4.1、The bidder must be an independent legal entity registered in accordance with the law or a consortium composed of different legal entities。 3.1.4.2、In case of joint bidding, the following requirements shall be met: (6) If a consortium participates, it shall submit the consortium agreement and indicate the work and responsibilities to be undertaken by the leader and the parties, and promise that the parties to the consortium will bear joint and several liabilities to the tenderer once the contract is concluded; (7) Where a consortium participates in the bidding activities, the parties to the consortium may not participate in the bidding activities under the same contract separately or form a consortium with other members of the consortium; (8) The leader of the consortium must be the construction party;The legal representative of the lead or its authorized agent shall be responsible for signing the relevant documents of the bidding activity, and the payment of bid security and other fees, signing and sealing of the bid documents shall be signed by the lead; (9) To participate in the bidding activities in the form of a consortium, the leader must present CA in the Kaifeng public resources electronic trading service platform member system Digital certificate registration, consortium members do not need to register; (10) The number of consortiums shall not exceed3家。 3.1.5The bidder shall not have a criminal record of bribery in the past three years, and shall provide a letter of commitment, in its own format, and the object of commitment (the first bid section: enterprise, project manager of the general contract, construction project manager, survey person in charge, and design person in charge); 3.1.6Reputation requirements: The bidder shall not exist in the Treasury[2016]125In the Notice on Issues related to the Inquiry and Use of Credit Records in Government Procurement Activities, the act of refusing to participate in government procurement activities。Bidders should go through the "Credit China" website(www.creditchina.gov.cn)Inquire "trust-breaking persons subject to enforcement" and "Major tax law and trust-breaking subjects", Chinese government procurement website(www.ccgp.gov.cn)Query the "record list of serious illegal and dishonest behaviors in government procurement" channel to query your own credit record, and provide the query screenshot (the query date is after the announcement date, provide the relevant query screenshot and stamp the bidder's official seal)。(If it is a consortium bid, both the lead and the members of the consortium need to provide)。 3.1.7During the implementation of the project, the general contracting project manager and construction project manager shall not be replaced for any reason。 3.2Section 2: 3.2.1Qualification requirements: independent ability to bear civil liability, valid business license: 3.2.2Project leader requirements: The project leader to be dispatched must have a first-class cost engineer professional qualification (need to provide relevant certificates, labor contracts and2023年1月1sun-to-day3Proof of social security payment for a month); 3.2.3Financial requirements: The financial situation is good, and there is no property being taken over or frozen;Bidder must provide must provide business2020年度、2021年度、2022The annual financial audit report (including balance sheet, cash flow statement and income statement) audited by an accounting firm or audit institution. If the enterprise is newly established less than one year ago, it shall provide the financial statements since its establishment。 3.2.4Performance requirements:tenderer 2020 年 1 月 1 Since the enterprise has at least1Whole process cost consulting or follow-up audit cost consulting of a similar project (provide contract or notice of award)。 3.2.5Joint bids are not accepted for the second section of the project。 3.2.6The bidder shall not have a criminal record of bribery in the past three years, and shall provide a letter of commitment, in a self-drafted format, and the object of commitment (the second bid paragraph: enterprises and project leaders).。 3.2.7Reputation requirements: The bidder shall not exist in the Treasury[2016]125In the Notice on Issues related to the Inquiry and Use of Credit Records in Government Procurement Activities, the act of refusing to participate in government procurement activities。Bidders should go through the "Credit China" website(www.creditchina.gov.cn)Inquire "trust-breaking persons subject to enforcement" and "Major tax law and trust-breaking subjects", Chinese government procurement website(www.ccgp.gov.cn)Query the "record list of serious illegal and dishonest behaviors in government procurement" channel to query your own credit record, and provide the query screenshot (the query date is after the announcement date, provide the relevant query screenshot and stamp the bidder's official seal)。(If it is a consortium bid, both the lead and the members of the consortium need to provide)。 3.2.8During the implementation of the project, the person in charge of the proposed project shall not be replaced for any reason。 3.3Section 3: 3.3.1The bidder has the status of an independent enterprise legal person,Have a valid three-in-one business license。 3.3.2The bidder shall have Grade B or above qualification of professional supervision of housing construction or comprehensive qualification of project supervision;The chief supervision engineer of the project to be assigned by the bidder shall be qualified as a national registered supervision engineer specializing in housing construction engineering. And in personnel, equipment, capital and other aspects of the corresponding supervision ability。 3.3.3The proposed project director shall have the relevant professional national registered supervision engineer qualification, and other supervisors shall have professional qualification certificates。 3.3.4Social security requirements: The bidder intends to send the project director and the entrusted agent must be the staff of the unit, and pay the pension insurance in the unit (provided2023年1月1Social security certification materials paid for any consecutive three months since the date of employment, the newly hired personnel shall be counted from the date of employment, and the time of issuance shall not be earlier than the time of announcement.。 3.3.5Financial requirements: Enterprise must be provided2020年度、2021年度、2022The annual financial audit report (including balance sheet, cash flow statement and income statement) audited by an accounting firm or audit institution. If the enterprise is newly established less than one year ago, it shall provide the financial statements since its establishment。 3.3.6Reputation requirements: The bidder shall not exist in the Treasury[2016]125In the Notice on Issues related to the Inquiry and Use of Credit Records in Government Procurement Activities, the act of refusing to participate in government procurement activities。Bidders should go through the "Credit China" website(www.creditchina.gov.cn)Inquire "trust-breaking persons subject to enforcement" and "Major tax law and trust-breaking subjects", Chinese government procurement website(www.ccgp.gov.cn)Query the "record list of serious illegal and dishonest behaviors in government procurement" channel to query your own credit record, and provide the query screenshot (the query date is after the announcement date, provide the relevant query screenshot and stamp the bidder's official seal)。(If it is a consortium bid, both the lead and the members of the consortium need to provide)。 3.3.7The consortium bid is not accepted in the third section of the project。
|
4.4.2 Determine the qualifications and abilities of the candidates to respond to the requirements of the bidding documents
Pass the list
First lot Tongxu County Dasanggou agricultural and sideline products service center construction projectEPCGeneral contract
序号 |
Bidder name |
Tender offer |
1 |
Guizhou Zhongjian Weiye Construction (Group) Co., LTD |
Construction and installation rate of nine hundred and seventy-eight percent(97.85%)Investigation fee697700Yuan, design fee2595200元 |
2 |
Guangzhou fourth construction engineering Co., LTD |
Construction and installation rate of nine hundred and seventy-seven percent(97.70%)Investigation fee700000Yuan, design fee2600000元 |
3 |
Xi 'an Aerospace Construction Group Co., LTD |
Construction and installation rate of nine hundred and seventy-three percent(97.93%)Investigation fee698000Yuan, design fee2596000元 |
4 |
Guizhou Construction Engineering Group Third construction engineering Co., LTD |
Construction and installation rate of nine hundred and seventy-eight percent(97.98%)Investigation fee699800Yuan, design fee2597500元 |
5 |
Fujian Lugang (Group) Co., LTD |
Construction and installation rate of nine hundred and seventy-eight percent(97.81%)Investigation fee700000Yuan, design fee2600000元 |
6 |
Guangdong Dianbai Construction Group Co., LTD |
Construction and installation rate of nine hundred and seventy-eight percent(97.98%)Investigation fee699790Yuan, design fee2599220元 |
Second lot Tongxu County Dasanggou agricultural and sideline products service center construction project cost of the whole process
序号 |
Bidder name |
Tender offer |
1 |
Zhongxing Yu Construction Management Co., LTD |
Three hundred and ninety thousand and six hundred yuan(¥309,600.00) |
2 |
Zhong-hongye Engineering Consultants Limited |
Three hundred and eighty thousand eight hundred yuan(¥308,800.00) |
3 |
Henan Province Jialong project management Co., LTD |
Two hundred and fifty-two thousand yuan(¥252,000.00) |
4 |
Henan Haina construction management Co., LTD |
Three hundred and ten thousand yuan(¥310,000.00) |
5 |
Jianda Guoxin Engineering management Co., LTD |
Two hundred and eighty-eight thousand yuan(¥298,000.00) |
6 |
Zhongyuan Tianwei Group Co. LTD |
Three hundred and fifty thousand eight hundred and ninety-two yuan(¥359,892.00) |
Third lot Tongxu County Dasanggou agricultural and sideline products service center construction project supervision
序号 |
Bidder name |
Tender offer |
1 |
Yutong Engineering Management Co., LTD |
One hundred and thirty-nine thousand five hundred yuan(¥1,039,500.00) |
2 |
Zhongxing Yu Construction Management Co., LTD |
One hundred and fifty thousand yuan(¥1,056,000.00) |
3 |
Zhongyun Tianlong Engineering Group Co., LTD |
One hundred and eighty thousand yuan(¥1,080,000.00) |
4 |
Jingyuan International Engineering Consulting Co., LTD |
One hundred and forty-one thousand and two hundred yuan(¥1,041,200.00) |
5 |
Zhengzhou Zhongcheng Construction consulting Co., LTD |
One million and forty thousand yuan(¥1,040,000.00) |
6 |
Henan Tianhong construction engineering consulting Co., LTD |
One hundred and twenty-three thousand yuan(¥1,023,000.00) |
7 |
Sino-singapore Huadu International Engineering Consulting Co., LTD |
One million and thirty-six thousand and six hundred yuan(¥1,036,600.00) |
8 |
Zhongyu Hengxin Engineering Consulting Co., LTD |
One hundred and thirty-eight thousand six hundred yuan(¥1,038,600.00) |
9 |
Henan Zhengkun construction engineering consulting Co., LTD |
One hundred and ninety-two thousand yuan(¥1,092,000.00) |
10 |
Phalanx Engineering Consulting Co. LTD |
One hundred and eighty thousand yuan(¥1,080,000.00) |
11 |
Henan Shuncheng construction engineering management Co., LTD |
One million thirty-four thousand six hundred yuan(¥1,034,600.00) |
12 |
Henan provincial city investment project management Co., LTD |
One hundred and forty-one thousand yuan(¥1,041,000.00) |
13 |
Feng Tai construction engineering management Co., LTD |
One hundred and one hundred and nine thousand and nine hundred and eight hundred yuan(¥1,199,980.00) |
14 |
Henan Zhongyuan Construction Supervision center Co., LTD |
One hundred and ninety-two thousand yuan(¥1,092,000.00) |
15 |
Henan Everbright Construction management Co., LTD |
One hundred and eighty thousand yuan(¥1,080,000.00) |
16 |
Zhongding Jinghong Engineering Management Co., LTD |
One hundred and eighty-eight thousand yuan(¥1,068,000.00) |
The method of recommending candidates for selection according to the bidding documents:
Methods of recommending candidates for evaluation:
1Calculate the benchmark price of bid evaluationC:
C=All evaluation conclusions shall be the average of the bid prices of qualified bidders (calculation results are reserved2Decimal place)
Identify the candidate for selection:
The number of qualified bidders for all evaluation conclusions isFThe bid evaluation committee shall sort the bids of the qualified bidders in order from low to high. If the bids are equal, the bids shall be sorted in order from small to large according to the serial number of the bidders on the bid opening record sheet。
①当F<3The tenderer shall bid again。
②当3≤F≤10All the bidders who are qualified by the evaluation conclusion are recommended as the bidding candidates。
③当10<F≤20Shall be calculated according to the difference between the bid price and the benchmark bid evaluation price of all qualified bidders, which is higher than the absolute minimum of the benchmark bid evaluation price difference3The absolute value of the difference between one bidder and the price below (or equal to) the bid evaluation benchmark is the smallest7One bidder is recommended as the candidate for bid selection。
当20<F≤100The difference between the bid price of the qualified bidder and the benchmark price of bid evaluation shall be calculated according to all evaluation conclusions
The absolute value of the spread above the bid evaluation benchmark is the smallest6The absolute value of the difference between one bidder and the price below (or equal to) the bid evaluation benchmark is the smallest14One bidder is recommended as the candidate for bid selection。
当100<F≤200The difference between the bid quotation of the qualified bidder and the benchmark bid evaluation price shall be determined according to all evaluation conclusions
For calculation, the absolute value of the spread above the bid evaluation benchmark is the smallest9The absolute value of the difference between one bidder and the price below (or equal to) the bid evaluation benchmark is the smallest21One bidder is recommended as the candidate for bid selection。
当200<F≤500The difference between the bid quotation of the qualified bidder and the benchmark bid evaluation price shall be determined according to all evaluation conclusions
For calculation, the absolute value of the spread above the bid evaluation benchmark is the smallest12The absolute value of the difference between one bidder and the price below (or equal to) the bid evaluation benchmark is the smallest35One bidder is recommended as the candidate for bid selection。
当500<FShall be calculated according to the difference between the bid price of all qualified bidders and the benchmark price of bid evaluation
The absolute value of the price difference above the bid evaluation benchmark is the smallest15The absolute value of the difference between one bidder and the price below (or equal to) the bid evaluation benchmark is the smallest35One bidder is recommended as the candidate for bid selection。
Note: ① When the number of bidders higher or lower than the benchmark bid evaluation price is less than the number of candidates should be determined, the bid candidates should be recommended according to the actual number。
② If the bidder's offer appears in parallel, it will be shortlisted for the bidding candidate at the same time。The number of candidates selected is not limited to the number specified in the above principles。
Note: Only the construction and installation cost quotation is involved in the calculation of the benchmark price, arithmetic average and quotation score value of the bid evaluation, other quotations are not involved。
Recommended results are as follows:
序号 |
Bid the full name of the candidate |
Response condition |
1 |
Guizhou Zhongjian Weiye Construction (Group) Co., LTD |
响应 |
2 |
Guangzhou fourth construction engineering Co., LTD |
响应 |
3 |
Xi 'an Aerospace Construction Group Co., LTD |
响应 |
4 |
Guizhou Construction Engineering Group Third construction engineering Co., LTD |
响应 |
5 |
Fujian Lugang (Group) Co., LTD |
响应 |
6 |
Guangdong Dianbai Construction Group Co., LTD |
响应 |
序号 |
Bid the full name of the candidate |
Response condition |
1 |
Zhongxing Yu Construction Management Co., LTD |
响应 |
2 |
Zhong-hongye Engineering Consultants Limited |
响应 |
3 |
Henan Province Jialong project management Co., LTD |
响应 |
4 |
Henan Haina construction management Co., LTD |
响应 |
5 |
Jianda Guoxin Engineering management Co., LTD |
响应 |
6 |
Zhongyuan Tianwei Group Co. LTD |
响应 |
Section 3:Tongxu County Dasanggou agricultural and sideline products service center construction project supervision
1 |
Sino-singapore Huadu International Engineering Consulting Co., LTD |
响应 |
2 |
Zhongyu Hengxin Engineering Consulting Co., LTD |
响应 |
3 |
Yutong Engineering Management Co., LTD |
响应 |
4 |
Zhengzhou Zhongcheng Construction consulting Co., LTD |
响应 |
5 |
Henan provincial city investment project management Co., LTD |
响应 |
6 |
Jingyuan International Engineering Consulting Co., LTD |
响应 |
7 |
Zhongxing Yu Construction Management Co., LTD |
响应 |
8 |
Zhongding Jinghong Engineering Management Co., LTD |
响应 |
9 |
Zhongyun Tianlong Engineering Group Co., LTD |
响应 |
10 |
Henan Everbright Construction management Co., LTD |
响应 |
11 |
Phalanx Engineering Consulting Co. LTD |
响应 |
4.5 Circumstances and reasons for rejecting the bid:
Section 3:Failed to pass the list and reasons: Henan Liangzhihang Project Management Consulting Co., LTD. : The power of attorney is not signed, does not meet the requirements of the bidding document format, according to the invalid bid processing, Sichuan Yida Construction Project Management Co., LTD:If neither the enterprise nor the project director provides the honor certificate, the bid will be treated as invalid。
4.6 Comprehensive bid score of all bidders: none。
4.7 All bidders technical bid evaluation
Case: None。
4.8 Total score of all bidders: None。
5. Other contents of publicity stipulated in the bidding documents:无。
6. Publication media and publicity time
This announcement is also published on the "China Tendering and Bidding Public Service Platform" and the "Kaifeng Public Resources Trading Information Network"。Publicity period:2024年1月6日至2024年1月10日
Channels and methods for raising objections
According to the BianPublic Administration Office (2020)13The document stipulates that if the bidder has objections to the above results, it can raise objections to the tenderer on the public resources trading information network cable in Kaifeng City during the publicity period, and the overdue will no longer be accepted, and the tenderer should be from the date of receipt of the objection3Reply within days,If the objector still has objections to the reply or the tenderer fails to make a reply within the prescribed time, the objector may do so on the date of publicity10Within days (objection reply period does not count) in the Kaifeng public resources trading information network online complaint。(In the important document column of the Kaifeng public resources trading information website, there are text formats and requirements for objections and complaints of construction projects)。
8. Contact information
Tenderer: Tongxu County Tonghui Urban and Rural Development Co., LTD
Address: Tongxu County administrative Road east section6Office building No.
Contact: Mr. Zhang
Contact number:0371-24939666
Bidding agency: Henan Kaichuang Engineering Management Consulting Co., LTD
Add: Yufeng Road, Tongxu County, Kaifeng City3号
Contact: Ms. Liu
电话:0371-24990996
Supervision unit: Tongxu County construction project bidding and bidding Management Office
Contact information:0371-24868676
All rights reserved:Kaifeng city public resources trading information networkHost: Kaifeng public resources trading information network
Address: Kaifeng City citizens home 5th floor 邮编:475000 Email: kfggzyjyzx2018@163.com Website record number:Yu ICP prepared No. 12001764-1
Technical support:Zhengzhou Xinyuan Information Technology Co., LTD