Kaifeng City

2023 Road Sponge transformation project Binhe Road (Yangshiqiao - Hua Hua Road) Pump station connected pipe network and road sponge transformation project - Result announcement

Release time: 2024-03-13 09:48:49 Number of page views: Author: Kaifeng Public resources trading information Network

2023Road sponge transformation project Binhe Road (Yangshi Bridge-Chemical road) pump station connected pipeline network and road sponge transformation project

Result announcement

Fanda International Engineering Consulting Co., LTDKaifeng City Administration Bureau (Kaifeng City Comprehensive Law Enforcement Bureau)The commission, just2023Road sponge transformation project Binhe Road (Yangshi Bridge-Chemical road) pump station connected pipeline network and road sponge transformation project for public bidding, in20240227Bid opening and evaluation activities were carried out in accordance with the law in the Public Resources Trading Center of Kaifeng City。After the expiration of the period of publicity of the candidates, the bidding committee shall, in accordance with the principles, methods and procedures of the bidding20240312In the calibration room of Kaifeng public resources Trading Center, the calibration was carried out by checking random method。The bidding results are now announced as follows:

1. Description of the bidding project

1.1Project Name:2023Road sponge transformation project Binhe Road (Yangshi Bridge-Chemical road) pump station connected pipeline network and road sponge transformation project

1.2Project Number:FDZB-F-2024-002

1.3Source of funds: financial funds

1.4Total planned investment: approx8000万元

1.5Bidding method: open bidding

1.6Scope of tender:

Section 1: Bill of quantities, construction drawings (including changes in drawings) and all contents specified in the bidding documents

Section II: Supervision services during the construction phase and the liability period for engineering defects

Ii. Division of bid sections

2.1Bidding section division: The project is divided into two bidding sections

Section 1:2023Road sponge transformation project Binhe Road (Yangshi Bridge-Chemical road) pump station connected pipe network and road sponge transformation project construction

Section 2:2023Road sponge transformation project Binhe Road (Yangshi Bridge-Supervision of pump station connected pipe network and road sponge transformation project

2.2Project Overview: Sponge transformation: the whole section of the sidewalk was broken and transformed into permeable pavement;At present, the tree is retained and a sunken green belt is added at the tree hole。

Drainage renovation: East moat-Park road:现状DN800The pipeline is removed and the original route is createdDN1000Pipeline, increase the pipe diameter of Binhe Road sewage network, so that the tannery pump station and heavy industry road pump station are alternate pump stations;Park road-Chemical industry section:Preserve the status quoDN800-DN1000According to the survey results of the pipe network, some seriously defective pipe sections are repaired and new sewage intercepting branch pipes are built。

Fast lane reconstruction: keep the current road section unchanged, the current carriageway is concrete pavement and asphalt concrete pavement, and the whole section is broken and new asphalt concrete road。

2.3Quality requirements: Qualified。

2.4Qualification Requirements:

Section 1:The bidder shall have Grade 1 (including Grade 1) or above qualification of general contracting of municipal public works construction issued by the construction administrative department

Section 2:The bidder shall have the Grade A qualification of municipal public works supervision or the comprehensive qualification of project supervision

2.5工期:

Section 1: Construction schedule:180Calendar days;

Section 2: Supervision service period: with the construction period and defect liability period;

2.6Bidding control total price: First bid:67007101.19Yuan;Section 2:619700.00元。

3. Bid opening time202402270925

Bid evaluation time202402271040

Calibration time202403121500

Iv. List of Bid Evaluation Committee members:Zhou Wenzhi, ZHANG Qingyong, Yang Fang, Zhao Jing, ZHANG Guoxian

List of members of the Bidding Committee:Yin Yanlu, Qin Weidong, ZHAO Mingdong

5. Verify information

The verification contents include: the first paragraph: enterprise credit information,Corporate bribery inquiry,Screenshot of company information, shareholder or investor information,Finalizing candidates business license, qualification certificate, safety production permit,Project manager certificate and safety production assessment certificate, full-time safety officer safety production assessment certificate, technical director certificate,Social security certificate,业绩。The second bidding section: corporate credit information, corporate bribery inquiry, screenshots of company information, shareholders or investors information, business license, qualification certificate, project director certificate, social security certificate, performance。

All calibration candidates passed the verification。

6. The information of the winning bidder is as follows

Section 1:

Winning bidFull name: Zhejiang Wanli Construction Engineering Co., LTD

Qualifications: Municipal public works construction general contracting level 1

Total bid price:62490880.98

Quality requirements: Qualified

工期:180Calendar day

Project Manager: Zhang Jianping

Certificate Number: Zhejiang1332010201124059

Section 2:

The full name of the winning bidder: Henan Jianwei Engineering Management Consulting Co., LTD

Qualifications and Abilities:Comprehensive qualification of project supervision

Total bid price:539750.00

Quality requirements: Qualified

Supervision service period: with the construction period and defect liability period

Project Director: Zhang Zhen

Certificate Number:41011414

7. Publishing media

The announcement of the results was published simultaneously on the "China Tendering and Bidding Public Service Platform", "Henan Electronic Tendering and Bidding Public Service Platform" and "Kaifeng Public Resources Trading Information Network"。Publicity time:20240314日至20240318Day (3 working days)

Viii. Channels and methods for raising objections:

  According to the BianPublic Administration Office (202013The document stipulates that if the bidder has objections to the above results, it can raise objections to the tenderer on the public resources trading information network cable in Kaifeng City during the publicity period, and the overdue will no longer be accepted, and the tenderer should be from the date of receipt of the objection3Reply within days,If the opposing party still has objections to the reply or the tenderer fails to reply within the prescribed time, the opposing party may start from the date of announcement of the result10Within days (objection reply period does not count) in the Kaifeng public resources trading information network online complaint。(In the column of important documents on this website, there are text formats and requirements for objections and complaints of construction projects)。

9. Contact information

Tenderer: Kaifeng City Administration Bureau (Kaifeng City Comprehensive Law Enforcement Bureau)

Address: Kaifeng eighth Street and Ankang Road intersection to the north200Rice city office complex

Contact person:Yin Yanlu

Contact number:0371-23933581

Bidding Agency: Fangda International Engineering Consulting Co., LTD

Contact: CAI Wang

Contact number:0371-23234066

地址:Yuxin Street, Longting District, Kaifeng18No. (Yaju Mei District Street Square Consulting)

Supervision unit: Kaifeng City Housing and Urban-Rural Development Bureau

Contact number:0371-23859565

 




Download attachment:Announcement of results - Riverside Road
                 

All rights reserved:Kaifeng city public resources trading information networkHost: Kaifeng public resources trading information network
Address: Kaifeng City citizens home 5th floor 邮编:475000 Email: kfggzyjyzx2018@163.com Website record number:Yu ICP prepared No. 12001764-1

Technical support:Zhengzhou Xinyuan Information Technology Co., LTD